CITY OF NEW LISBON: New Lisbon Lake Culvert Install. Feasibility Study

Purpose

Perform a feasibility study to determine the impact of installing five 60 inch culverts on New Lisbon Lake as part of the interstate reconstruction. 1. Conduct an hydrology evaluation to predict flow patterns before and after installation of culverts. 2. Perform a water quality analysis. 3. Predict impact of water characteristics in the lake section to be reconnected as it flushes into the main boty of the lake. 4. Study will be conducted on a mass balance basis and consider the effects on algal populations, sedimentation , and recreational uses. 5. Prepare a final report on the results of the above tasks. 6. Disseminate information on the project results to the public by fact sheet, public meeting, and newspaper article.

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Lakes Grant
Large Scale Lake Planning
LPL-323
1995
Complete
 
Activities & Recommendations
Grant Awarded
Perform a feasibility study to determine the impact of installing five 60 inch culverts on New Lisbon Lake as part of the interstate reconstruction. 1. Conduct an hydrology evaluation to predict flow patterns before and after installation of culverts. 2. Perform a water quality analysis. 3. Predict impact of water characteristics in the lake section to be reconnected as it flushes into the main boty of the lake. 4. Study will be conducted on a mass balance basis and consider the effects on algal populations, sedimentation , and recreational uses. 5. Prepare a final report on the results of the above tasks. 6. Disseminate information on the project results to the public by fact sheet, public meeting, and newspaper article.
Develop/Distribute Brochures/Literature
Issue News/Media Release
Informational Meetings
Diagnostic/Feasibility Assessment
10100418
 
Watershed