PLEASANT LAKE PROTECTION & REHABILITATION DI: Pleasant Lake Fall Treatment Experimental Evaluation

Purpose

The Pleasant Lake Protection and Rehabilitation District is sponsoring a project to evaluate the effectiveness of a fall treatment in a bay located in Pleasant Lake. Project final deliverables include: results of the 2019 and 2020 sub P/I surveys for the bay in separate excel spreadsheets; results of the 2019 residual sampling; and a brief report discussing the residual testing efforts by a lake volunteer. Specific project activities include: 1) implementing a fall chemical treatment (not funded by grant); 2) conducting a summer 2019 sub P/I survey on bay; 3) collection of 10 sets of residual samples after the fall 2019 chemical treatment; 4) conducting a summer 2020 sub P/I survey on bay; 5) compiling results in excel spreadsheets; and 6) writing a short report discussing the residual testing efforts. Special Conditions: 1) All data shall be entered into the SWIMS database. This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Aquatic Invasives Grant
Aquatic Invasives Education
AEPP56519
2019
Complete
 
Activities & Recommendations
Grant Awarded
Grant AEPP56519 awarded
 
Watershed
 
Waters