FRIENDS OF DEVIL'S LAKE STATE PARK: LMI-Devil's Lake Bottom Withdrawal Pipe Alterations

Purpose

The Friends of Devil's Lake State Park propose this project to reconstruct the siphon pipe system at Devil's Lake State Park, Sauk County, by lowering the portion of the siphon that is above the ordinary high water mark (OHWM) lake level so that the pipe will flow as a gravity feed flow system whenever the lake level is above the OHWM. This entails digging up about 900' of the pipe, and lowering the highest point. An additional butterfly flow valve will be installed to provide control of the pipe for safety and operational purposes. Deliverables of this project will be a brief final report documenting that the project was completed, including photos of the project during construction. Special condition: The Sponsor agrees to abide by the "Conditions of Approval" contained in the Chapter 30 Regulated Activities manual code approval issued by the Department of Natural Resources on 6/6/06.

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Lakes Grant
Lake Protection Grant
LPT-358-10
2009
Complete
 
Reports and Documents
 
Activities & Recommendations
Lakes Protection Grant
Grant Awarded
The Friends of Devil's Lake State Park propose this project to reconstruct the siphon pipe system at Devil's Lake State Park, Sauk County, by lowering the portion of the siphon that is above the ordinary high water mark (OHWM) lake level so that the pipe will flow as a gravity feed flow system whenever the lake level is above the OHWM. This entails digging up about 900' of the pipe, and lowering the highest point. An additional butterfly flow valve will be installed to provide control of the pipe for safety and operational purposes. Deliverables of this project will be a brief final report documenting that the project was completed, including photos of the project during construction.
Project Deliverable
reconstruct the siphon pipe system at Devil's Lake State Park, Sauk County, by lowering the portion of the siphon that is above the ordinary high water mark (OHWM) lake level so that the pipe will flow as a gravity feed flow system whenever the lake level is above the OHWM. This entails digging up about 900' of the pipe, and lowering the highest point. An additional butterfly flow valve will be installed to provide control of the pipe for safety and operational purposes. Deliverables of this project will be a brief final report documenting that the project was completed, including photos of the project during construction.
Lake Management Plan Development
The Friends of Devil's Lake State Park propose this project to reconstruct the siphon pipe system at Devil's Lake State Park, Sauk County, by lowering the portion of the siphon that is above the ordinary high water mark (OHWM) lake level so that the pipe will flow as a gravity feed flow system whenever the lake level is above the OHWM.
 
Watershed
 
Waters