HARRY & LAURA NOHR CHAPTER OF TROUT UNLIMITE: 2011 Six Mile Creek Project

Purpose

The Harry and Laura Nohr Chapter of Trout Unlimited will undertake a River Management project on the Six Mile Creek Branch. This project will stabilize the stream banks to improve water and substrate quality for brown and brook trout and other cold-water species. Project deliverables include: 1.) Tapering eroding banks with a goal of 8:1 where possible and armoring the toe, 2.) Installing habitat devices to enhance trout population size and structure, 3.) Using root wads to create structure where possible, 4.) building and installing bank hides/cribs/lunker structures in critical points, 5.) Increasing and improving gravel riffle areas where conditions allow, 6.) Seeding and mulching disturbed soil with grass mixes.

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

River Grant
River Protection Grant
RM-050-12
2011
Complete
 
Reports and Documents
HARRY AND LAURA NOHR CHAPTER OF TROUT UNLIMITED SIX MILE BRANCH HABITAT IMPROVEMENT PROJECT 2011
 
Activities & Recommendations
Control Streambank Erosion
The Harry and Laura Nohr Chapter of Trout Unlimited will undertake a River Management project on the Six Mile Creek Branch. This project will stabilize the stream banks to improve water and substrate quality for brown and brook trout and other cold-water species. Project deliverables include: 1.) Tapering eroding banks with a goal of 8:1 where possible and armoring the toe, 2.) Installing habitat devices to enhance trout population size and structure, 3.) Using root wads to create structure where possible, 4.) building and installing bank hides/cribs/lunker structures in critical points, 5.) Increasing and improving gravel riffle areas where conditions allow, 6.) Seeding and mulching disturbed soil with grass mixes.
Habitat Restoration - Instream
The Harry and Laura Nohr Chapter of Trout Unlimited will undertake a River Management project on the Six Mile Creek Branch. This project will stabilize the stream banks to improve water and substrate quality for brown and brook trout and other cold-water species. Project deliverables include: 1.) Tapering eroding banks with a goal of 8:1 where possible and armoring the toe, 2.) Installing habitat devices to enhance trout population size and structure, 3.) Using root wads to create structure where possible, 4.) building and installing bank hides/cribs/lunker structures in critical points, 5.) Increasing and improving gravel riffle areas where conditions allow, 6.) Seeding and mulching disturbed soil with grass mixes.
Grant Awarded
The Harry and Laura Nohr Chapter of Trout Unlimited will undertake a River Management project on the Six Mile Creek Branch. This project will stabilize the stream banks to improve water and substrate quality for brown and brook trout and other cold-water species. Project deliverables include: 1.) Tapering eroding banks with a goal of 8:1 where possible and armoring the toe, 2.) Installing habitat devices to enhance trout population size and structure, 3.) Using root wads to create structure where possible, 4.) building and installing bank hides/cribs/lunker structures in critical points, 5.) Increasing and improving gravel riffle areas where conditions allow, 6.) Seeding and mulching disturbed soil with grass mixes.
Protect Riparian or Shorelands
This project will stabilize the stream banks to improve water and substrate quality for brown and brook trout and other cold-water species. Project deliverables include: 1.) Tapering eroding banks with a goal of 8:1 where possible and armoring the toe- 2.) Installing habitat devices to enhance trout population size and structure- 3.) Using root wads to create structure where possible- 4.) building and installing bank hides/cribs/lunker structures in critical points- 5.) Increasing and improving gravel riffle areas where conditions allow- 6.) Seeding and mulching disturbed soil with grass mixes.
Fisheries Trout Stream Habitat Maintenance and Development
The Harry and Laura Nohr Chapter of Trout Unlimited will undertake a River Management project on the Six Mile Creek Branch. This project will stabilize the stream banks to improve water and substrate quality for brown and brook trout and other cold-water species. Project deliverables include: 1.) Tapering eroding banks with a goal of 8:1 where possible and armoring the toe, 2.) Installing habitat devices to enhance trout population size and structure, 3.) Using root wads to create structure where possible, 4.) building and installing bank hides/cribs/lunker structures in critical points, 5.) Increasing and improving gravel riffle areas where conditions allow, 6.) Seeding and mulching disturbed soil with grass mixes.
 
Watershed
 
Waters