ACTIVITY DETAILS

 
02-41-263675 COMMUNITY WITHIN THE CORRIDOR (CWC) EAST
Activity Type / Status Jurisdiction
ERP  OPEN DNR RR
Location Name County DNR Region
COMMUNITY WITHIN THE CORRIDOR - EAST BLOCK MILWAUKEE SOUTHEAST
Address Municipality
2748 N 32ND ST MILWAUKEE
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
SW 1/4 of the NE 1/4 of Sec 13, T07N, R21E 43.0690139 -87.9536164 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
4
Facility ID PECFA No. EPA ID Start Date End Date
241025400 2001-01-11
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
  Underground Storage Tank Flag
Site Files
Name File
SITE FILE DOCUMENTATION FOR ACTIVITY Download PDF Document
Actions and Documents
Date Code Name File Comment
2024-12-18 43 Site Activity Status Update Received Download PDF file INDOOR AIR DATA REC'D - REAL TIME COLLECTED VIA GC UNIT.
2024-12-18 99 Miscellaneous Download PDF file INFO REC'D VIA EMAIL - AIR FLOW RATE FOR PASSIVE SAMPLING.
2024-12-13 98 Technical Assistance Provided Download PDF file COMMISSIONING REVIEW AND COMMENTS ON UPCOMING COMMISSIONING EVENT.
2024-12-12 192 Operation & Maintenance (O & M) Report Received (fee) Download PDF file REC'D CK #8998 $425
2024-12-10 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file OM MANUAL
2024-11-22 99 Miscellaneous Download PDF file INFORMATION REC'D VIA EMAIL.
2024-11-20 99 Miscellaneous Download PDF file INFORMATION REQUESTED BY DNR TO SUPPORT THIER REVIEW OF 11/11/24 AND 11/14/24 COMMISSIONING REPORTS.
2024-11-14 97 Technical Assistance Request Received (fee) Download PDF file REC'D CK #8950 $700, THIRD ROUND OF COMMISSIONING RPT
2024-11-11 43 Site Activity Status Update Received Download PDF file PROPOSED PLAN FOR 4TH ROUND OF COMMISSIONING OF VAPOR MITIGATION SYSTEM
2024-10-30 99 Miscellaneous Download PDF file EMAIL CORRESPONDENCE BETWEEN DNR AND CONSULTANT ON WINTER COMMISSIONING NEEDS.
2024-10-23 99 Miscellaneous Download PDF file EMAIL FROM DNR TO CWC ON UPCOMING VMS COMMISSIONING SCHEDULE AND DOCUMENT SUBMITTALS.
2024-10-21 99 Miscellaneous MEETING W/ CWC, CONSULTANTS, DNR, DHS, & CITY OF MILWAUKEE DNS - DISCUSS VMS COMMISSIONING STATUS.
2024-10-16 43 Site Activity Status Update Received Download PDF file EMAIL FROM K. SINGH - GC CALIBRATION INFORMATION SUBMITTED TO THE DNR.
2024-10-04 43 Site Activity Status Update Received Download PDF file EMAIL FROM CWC W/ DATA ATTACHED.
2024-10-03 99 Miscellaneous Download PDF file EMAIL CORRESPONDENCE W/ CWC AND CITY OF MILWAUKEE'S DNS AND HEALTH DEPT W/ 2023 ORDER OF EVACUATION
2024-10-01 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file SUPPLEMENTAL SITE INVESTIGATION REPORT
2024-09-30 43 Site Activity Status Update Received Download PDF file EMAIL FROM CWC W/ DATA.
2024-09-30 99 Miscellaneous Download PDF file EMAIL RESPONSE FROM DNR W/ ATTACHMENTS.
2024-08-27 99 Miscellaneous Download PDF file EMAILS BETWEEN DNR AND K. SINGH - COMMISSIONING STATUS AND NEXT STEPS FOR REPORT SUBMITTAL.
2024-07-10 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2024 - 6/30/2024
2024-06-24 43 Site Activity Status Update Received Download PDF file UTILITY CORRIDORS VAPOR ASSESSMENT
2024-06-13 99 Miscellaneous Download PDF file VIRTUAL MTG W/ DNR AND CWC TEAM ON 06/12 TO DISCUSS 05/30 DNR LETTER. EMAIL SUMMARY OF MTG.
2024-05-30 98 Technical Assistance Provided Download PDF file DNR REVIEW OF CWC'S 04/09/24 COMMISSIONING REPORT (FOR MARCH 2024 EVENT).
2024-05-01 43 Site Activity Status Update Received Download PDF file WEEKLY REPORT FOR THE WEEK ENDING 4/27/2024
2024-04-29 99 Miscellaneous Download PDF file INFORMATION SUBMITTED VIA EMAIL
2024-04-16 99 Miscellaneous Download PDF file INFO REQUESTED BY DNR VIA EMAIL
2024-04-15 99 Miscellaneous Download PDF file INFORMATION SUBMITTED TO THE DNR VIA EMAIL.
2024-04-09 97 Technical Assistance Request Received (fee) Download PDF file RECVD CK #8491 $700.00
2024-04-09 43 Site Activity Status Update Received Download PDF file 3RD ROUND COMMISSIONING PLAN
2024-04-04 43 Site Activity Status Update Received Download PDF file WEEKLY TEST RESULTS FOR WEEK ENDING IN 03/16/24.
2024-03-15 43 Site Activity Status Update Received Download PDF file WEEKLY TEST RESULTS FOR WEEK ENDING IN 03/09/24.
2024-03-07 43 Site Activity Status Update Received Download PDF file WEEKLY TEST RESULTS FOR WEEK ENDING IN 03/02/24.
2024-02-28 43 Site Activity Status Update Received Download PDF file WEEKLY TEST RESULTS FOR WEEK ENDING IN 02/24/24
2024-02-20 43 Site Activity Status Update Received Download PDF file WEEKLY TEST RESULTS FOR WEEK ENDING IN 02/17/24.
2024-02-18 43 Site Activity Status Update Received Download PDF file WEEKLY TEST RESULTS FOR WEEK ENDING IN 02/10/24.
2024-02-05 43 Site Activity Status Update Received Download PDF file WEEKLY TEST RESULTS FOR WEEK ENDING IN 02/03/24
2024-02-01 43 Site Activity Status Update Received Download PDF file WEEKLY TEST RESULTS FOR WEEK ENDING IN 01/27/24.
2024-01-30 43 Site Activity Status Update Received Download PDF file WEEKLY TEST RESULTS FOR WEEK ENDING 01/20/24.
2024-01-19 364 VAL and/or VRSL Exceeded
2024-01-16 43 Site Activity Status Update Received Download PDF file WEEKLY TEST RESULTS FOR WEEK ENDING IN 01/13/24.
2024-01-15 43 Site Activity Status Update Received Download PDF file STATUS REPORT & SSI WORK PLAN
2024-01-09 43 Site Activity Status Update Received Download PDF file WEEKLY TEST RESULTS FOR WEEK ENDING IN 01/06/24.
2024-01-05 99 Miscellaneous Download PDF file SUPPLEMENTAL INFO REC'D FROM CWC ON COMMISSIONING PLAN. ORIGINAL PLAN REC'D 11/30/23.
2024-01-05 98 Technical Assistance Provided Download PDF file COMMISSIONING PLAN REVIEW LETTER.
2024-01-03 43 Site Activity Status Update Received Download PDF file WEEKLY TEST RESULTS FOR WEEKS ENDING IN 12/22/23 & 12/29/23
2024-01-02 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2023 - 12/31/2023
2023-12-15 99 Miscellaneous Download PDF file CWC REQUESTS THE USE OF AN AREA OF CONTAMINATION UNDER RCRA FOR TEMP. STOCKPILE OF HAZARDOUS SOIL.
2023-12-15 99 Miscellaneous Download PDF file DNR PROVIDES CWC CONDITIONAL APPROVAL FOR USE OF AN AREA OF CONTAMINATION UNDER RCRA UNTIL 01/12/24.
2023-12-13 99 Miscellaneous Download PDF file EMAIL FROM DNR - INFO REQUESTED FOR COMMISSIONING PLAN REVIEW.
2023-12-12 43 Site Activity Status Update Received Download PDF file TEST RESULTS FOR WEEK ENDING IN 12/9/23 - REMEDIAL SOIL EXCAVATIONS ARE UNDERWAY
2023-12-11 40 Remedial Action Options Report (RAOR) Approved Download PDF file DNR REVIEW LETTER FOR REVISED RAOR SUBMITTED ON 11/16/23
2023-12-05 39 Remedial Action Options Report (RAOR) Received (non-fee) Download PDF file DUPLICATE RAOR REC’D – HYDROGEOLOGIST SIGNATURE INCLUDED
2023-11-30 97 Technical Assistance Request Received (fee) Download PDF file REC'D CK #8259 $700
2023-11-28 43 Site Activity Status Update Received Download PDF file PROPOSED PLAN FOR 2ND ROUND OF COMMISSIONING OF VAPOR MITIGATION SYSTEM
2023-11-20 43 Site Activity Status Update Received Download PDF file TEST RESULTS FOR WEEK ENDING 11/18/23. REMEDIAL SOIL EXCAVATIONS UNDERWAY.
2023-11-17 99 Miscellaneous Download PDF file EMAIL FROM DNR ON RESPONSE TIMELINE FOR CWC'S REVISED REMEDIAL ACTION OPTIONS REPORT, RECD 11/16/23.
2023-11-16 43 Site Activity Status Update Received Download PDF file TEST RESULTS FOR WEEK ENDING IN 11/11/23. REMEDIAL SOIL EXCAVATIONS UNDERWAY.
2023-11-16 39 Remedial Action Options Report (RAOR) Received (non-fee) Download PDF file
2023-11-07 99 Miscellaneous Download PDF file DNR EMAIL - REVIEW OF CWC'S 10/26/23 SOIL BORING REPORT FOR HOTSPOT AREAS.
2023-11-04 43 Site Activity Status Update Received Download PDF file TEST RESULTS FOR WEEK ENDING IN 11/04/23. REMEDIAL SOIL EXCAVATIONS COMMENCE.
2023-10-31 43 Site Activity Status Update Received Download PDF file TEST RESULTS FOR WEEK ENDING IN 10/28/23.
2023-10-26 43 Site Activity Status Update Received Download PDF file REPORT OF TEST RESULTS FROM SOIL BORINGS IN HOTSPOT AREAS
2023-10-26 43 Site Activity Status Update Received Download PDF file DNR REC'D ANTICIPATED SOIL EXCAVATION SCHEDULE FROM K. SINGH.
2023-10-24 98 Technical Assistance Provided Download PDF file COLUMN SEALING OPTIONS REPORT REVIEW LETTER FROM DNR.
2023-10-16 99 Miscellaneous MEETING W/ DNR, DHS, CITY OF MILWAUKEE'S HEALTH DEPT. AND DNS, AND CWC TO DISCUSS SITE STATUS.
2023-10-13 99 Miscellaneous Download PDF file EMAIL FROM DNR TO CWC - TIMELINE FOR DNR RESPONSE TO CWC'S 10/10/23 COLUMN SEALING REPORT.
2023-10-10 97 Technical Assistance Request Received (fee) Download PDF file REC'D CK #8136 $700, COLUMN SEALING OPTIONS RPT
2023-10-06 99 Miscellaneous Download PDF file DNR LETTER - SOIL SAMPLING PLAN REVIEW.
2023-10-06 43 Site Activity Status Update Received Download PDF file TEST RESULTS FOR WEEK ENDING IN 09/30/2023.
2023-10-06 43 Site Activity Status Update Received Download PDF file EST RESULTS FOR WEEK ENDING IN 10/07/2023.
2023-09-28 43 Site Activity Status Update Received Download PDF file TEST RESULTS FOR WEEK ENDING IN 09/23/2023.
2023-09-22 99 Miscellaneous Download PDF file EMAIL FROM DNR - COMMENTS ON SOIL SAMPLING PLAN SUBMITTED ON 09/15/23.
2023-09-22 43 Site Activity Status Update Received Download PDF file EMAIL FROM K. SINGH - SOIL SAMPLING PLAN UPDATES.
2023-09-14 43 Site Activity Status Update Received Download PDF file SOIL SAMPLING PLAN
2023-09-12 43 Site Activity Status Update Received Download PDF file TEST RESULTS FOR WEEK ENDING 09/09/2023
2023-09-07 82 Remedial Action Options Report (RAOR) Not Approved Download PDF file
2023-08-31 43 Site Activity Status Update Received Download PDF file INDOOR AIR DATA FOR 08/31/23.
2023-08-30 43 Site Activity Status Update Received Download PDF file INDOOR AIR DATA FOR 08/28/23.
2023-08-30 43 Site Activity Status Update Received Download PDF file INDOOR AIR DATA FOR 08/30/23.
2023-08-29 43 Site Activity Status Update Received Download PDF file INDOOR AIR DATA FOR 08/29/23.
2023-08-24 43 Site Activity Status Update Received Download PDF file BIOCHAR INVESTIGATION - SUPPLEMENTAL INFO FOR THE REMEDIAL ACTION OPTIONS REPORT (AC 143, 07/25/23)
2023-08-22 43 Site Activity Status Update Received Download PDF file TEST RESULTS FOR WEEK ENDING 08/19/2023.
2023-08-19 43 Site Activity Status Update Received Download PDF file INDOOR AIR DATA FOR 08/19/2023.
2023-08-17 43 Site Activity Status Update Received Download PDF file INDOOR AIR DATA FOR 08/17/2023.
2023-08-16 43 Site Activity Status Update Received Download PDF file INDOOR AIR DATA FOR 08/16/2023
2023-08-15 43 Site Activity Status Update Received Download PDF file TEST RESULTS FOR WEEK ENDING 08/12/2023
2023-08-15 43 Site Activity Status Update Received Download PDF file INDOOR AIR DATA FOR 08/15/2023
2023-08-14 43 Site Activity Status Update Received Download PDF file INDOOR AIR DATA FOR 08/14/2023
2023-08-11 43 Site Activity Status Update Received Download PDF file INDOOR AIR DATA.
2023-08-10 43 Site Activity Status Update Received Download PDF file INDOOR AIR DATA
2023-08-09 43 Site Activity Status Update Received Download PDF file INDOOR AIR DATA
2023-08-08 43 Site Activity Status Update Received Download PDF file INDOOR AIR DATA
2023-08-07 43 Site Activity Status Update Received Download PDF file TESTING RESULTS FOR WEEK ENDING 08/05/2023.
2023-08-07 43 Site Activity Status Update Received Download PDF file NDOOR AIR DATA FROM 08/07.
2023-08-04 43 Site Activity Status Update Received Download PDF file INDOOR AIR DATA FROM 08/04.
2023-08-03 43 Site Activity Status Update Received Download PDF file INDOOR AIR DATA FROM 08/03.
2023-07-31 43 Site Activity Status Update Received Download PDF file TEST RESULTS FOR WEEK ENDING IN 07/29/23.
2023-07-26 99 Miscellaneous Download PDF file EMAIL FROM DNR TO CWC - WEEKLY PROGRESS REPORTS ARE NO LONGER REQUIRED UNDER DNR EMERGENCY ORDER.
2023-07-25 99 Miscellaneous Download PDF file EMAIL FROM DNR ON REMEDIAL ACTION OPTIONS REPORT REVIEW TIMELINE.
2023-07-25 143 Remedial Action Options Report (RAOR) Received (fee) Download PDF file REC'D CK #7962 $1050
2023-07-24 43 Site Activity Status Update Received Download PDF file WEEKLY PROGRESS REPORT - REQUIRED UNDER DNR EMERGENCY ORDER.
2023-07-17 43 Site Activity Status Update Received Download PDF file WEEKLY PROGRESS REPORT - REQUIRED UNDER DNR EMERGENCY ORDER.
2023-07-10 43 Site Activity Status Update Received Download PDF file WEEKLY PROGRESS REPORT - REQUIRED UNDER DNR EMERGENCY ORDER
2023-07-03 43 Site Activity Status Update Received Download PDF file WEEKLY PROGRESS REPORT - REQUIRED UNDER DNR EMERGENCY ORDER.
2023-07-02 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 01/01/2023 - 06/30/2023
2023-06-26 43 Site Activity Status Update Received Download PDF file WEEKLY PROGRESS REPORT - REQUIRED UNDER DNR EMERGENCY ORDER.
2023-06-19 43 Site Activity Status Update Received Download PDF file WEEKLY PROGRESS REPORT - REQUIRED UNDER DNR EMERGENCY ORDER.
2023-06-12 43 Site Activity Status Update Received Download PDF file WEEKLY PROGRESS REPORT - REQUIRED UNDER DNR EMERGENCY ORDER.
2023-06-07 99 Miscellaneous Download PDF file DNR REVIEW OF INTERIM AND REMEDIAL ACTION STATUS (LETTER).
2023-06-07 99 Miscellaneous IN-PERSON/VIRTUAL MEETING W/ DNR, DHS, CITY OF MILWAUKEE HEALTH DEPARTMENT, CWC, & KSINGH.
2023-06-07 99 Miscellaneous Download PDF file LETTER FROM DNR, DHS, AND CITY OF MILWAUKEE TO CWC EAST BLOCK RESIDENTS ON THE SITE STATUS.
2023-06-05 43 Site Activity Status Update Received Download PDF file WEEKLY PROGRESS REPORT - REQUIRED UNDER DNR EMERGENCY ORDER.
2023-05-30 43 Site Activity Status Update Received Download PDF file CWC SUBMITS A RESPONSE TO DNR'S 05/08/23 LETTER - CORRECTIVE ACTION PLAN UPDATE
2023-05-30 43 Site Activity Status Update Received Download PDF file WEEKLY PROGRESS REPORT - REQUIRED UNDER DNR EMERGENCY ORDER
2023-05-22 43 Site Activity Status Update Received Download PDF file WEEKLY PROGRESS REPORT - REQUIRED UNDER DNR EMERGENCY ORDER.
2023-05-15 43 Site Activity Status Update Received Download PDF file WEEKLY PROGRESS REPORT - REQUIRED UNDER DNR EMERGENCY ORDER
2023-05-10 99 Miscellaneous SITE VISIT WITH DNR, DHS, CITY OF MILWAUKEE HEALTH DEPARTMENT, CWC, AND KSINGH.
2023-05-08 43 Site Activity Status Update Received Download PDF file WEEKLY PROGRESS REPORT - REQUIRED UNDER DNR EMERGENCY ORDER
2023-05-08 98 Technical Assistance Provided Download PDF file DNR REVIEW LETTER FOR CWC'S EMERGENCY CORRECTIVE ACTION PLAN, RECEIVED 04/25/23.
2023-05-01 43 Site Activity Status Update Received Download PDF file WEEKLY PROGRESS REPORT - REQUIRED UNDER DNR EMERGENCY ORDER
2023-04-25 97 Technical Assistance Request Received (fee) Download PDF file REC'D CK #7778 $700, EMERGENCY CORRECTIVE ACTION PLAN
2023-04-25 99 Miscellaneous Download PDF file EMAIL CORRESPONDENCE BETWEEN DNR, CWC, AND KSINGH CONCERNING DOCUMENTATION REQUIREMENTS.
2023-04-24 43 Site Activity Status Update Received Download PDF file WEEKLY PROGRESS REPORT - REQUIRED UNDER DNR EMERGENCY ORDER.
2023-04-21 43 Site Activity Status Update Received Download PDF file INFO & DOCUMENTATION SUBMITTED VIA EMAIL. AS-BUILT DRAWINGS PROVIDED, AS REQUIRED IN EMERGENCY ORDER
2023-04-21 43 Site Activity Status Update Received Download PDF file CWC SUBMITS AS-BUILT DRAWINGS FOR VAPOR MITIGATION SYSTEM.
2023-04-20 99 Miscellaneous Download PDF file DNR RESPONSE TO WEEKLY PROGRESS REPORT SUBMITTED ON 04/17/23.
2023-04-20 43 Site Activity Status Update Received Download PDF file INO RECV'D VIA EMAIL, DOCUMENTATION OF NOTIFICATIONS SENT TO RESIDENTS AS WELL
2023-04-17 43 Site Activity Status Update Received Download PDF file WEEKLY PROGRESS REPORT - REQUIRED UNDER DNR EMERGENCY ORDER.
2023-04-13 99 Miscellaneous Download PDF file DNR RESPONSE TO THE WEEKLY SUMMARY REPORT SUBMITTED ON 04/10/23.
2023-04-13 99 Miscellaneous Download PDF file DNR RESPONSE TO THE EMERGENCY ORDER DOCUMENTATION SUBMITTED ON 04/07/23.
2023-04-10 43 Site Activity Status Update Received Download PDF file WEEKLY PROGRESS REPORT - REQUIRED UNDER DNR EMERGENCY ORDER.
2023-04-07 43 Site Activity Status Update Received Download PDF file DOCUMENTATION PROVIDED IN RESPONSE TO THE EMERGENCY ORDER - ITEMS 1 AND 2 OF SECTION III PROVIDED
2023-04-07 43 Site Activity Status Update Received Download PDF file 1ST ROUND COMMISSIONING REPORT
2023-04-07 126 Interim Action Report Received (non-fee) Download PDF file INTERIM REMEDIAL ACTION REPORT
2023-04-06 99 Miscellaneous Download PDF file DNR SENDS FOLLOW-UP EMAIL FOR 04/05/23 MEETING.
2023-04-05 43 Site Activity Status Update Received Download PDF file 4/3/23 - DAILY SUMMARY RPT SUBMITTED TO THE DNR BY THE RP & CONSULTANT
2023-04-05 43 Site Activity Status Update Received Download PDF file 4/4/23 - DAILY SUMMARY RPT SUBMITTED TO THE DNR BY THE RP & CONSULTANT
2023-04-04 99 Miscellaneous Download PDF file EMERGENCY ORDER CORRESPONDENCE - EXTENSION PROVIDED IN AN ADDENDUM & OTHER INFO PROVIDED BY DNR
2023-04-03 43 Site Activity Status Update Received Download PDF file 04/01/23 - DAILY SUMMARY RPT SUBMITTED TO THE DNR BY THE RP & CONSULTANT
2023-04-03 43 Site Activity Status Update Received Download PDF file 03/30/23 - DAILY SUMMARY RPT SUBMITTED TO THE DNR BY THE RP & CONSUTLANT
2023-04-03 43 Site Activity Status Update Received Download PDF file DAILY SUMMARY RPT SUBMITTED TO THE DNR BY THE RP & CONSUTLANT
2023-04-03 43 Site Activity Status Update Received Download PDF file PORTABLE GAS CHROMATOGRAPH MEASUREMENT SUMMARY RPT SUBMITTED TO THE DNR
2023-03-31 99 Miscellaneous Download PDF file DNR RESPONSE TO 3/30/23 SAMPLING PLAN
2023-03-31 99 Miscellaneous Download PDF file DNR ACCESS REQ FOR A SECOND SITE VISIT - ACCESS APPROVED BY CWC - DNR CONDUCTS SITE VISIT
2023-03-31 99 Miscellaneous Download PDF file EMERGENCY ORDER ISSUED BY DNR FOR CWC EAST BLOCK
2023-03-31 43 Site Activity Status Update Received Download PDF file ACTION SUMMARY RPT 3/28/2023
2023-03-31 43 Site Activity Status Update Received Download PDF file ACTION SUMMARY RPT 3/29/2023
2023-03-31 43 Site Activity Status Update Received Download PDF file EMAIL FROM RP - SUMMARY OF PORTABLE GAS CHROMATOGRAPH MEASUREMENTS COLLECTED & RESULTS
2023-03-30 99 Miscellaneous Download PDF file DNR ACCESS REQUEST FOR SITE VISIT. ACCESS APPROVED BY CWC. DNR CONDUCTS SITE VISIT.
2023-03-30 43 Site Activity Status Update Received Download PDF file MEMO/SAMPLING PLAN SUBMITTED TO DNR BY RP
2023-03-28 43 Site Activity Status Update Received Download PDF file EMAIL REC'D FROM CONSULTANT - ACTIONS TAKEN ON 03/27/23 BY RESPONSIBLE PARTY AND K. SINGH.
2023-03-28 99 Miscellaneous Download PDF file CWC ASKS DNR ABOUT RE-OCCUPANCY OF 2ND AND 3RD FLOORS. DNR RESPONDS.
2023-03-28 99 Miscellaneous Download PDF file MILWAUKEE HEALTH DEPT RESPONDS TO 03/28/23 DNR EMAIL
2023-03-27 99 Miscellaneous Download PDF file DNR REVIEW OF THE RP/CONSULTANT'S 03/25/23 IMMEDIATE ACTION PLAN - ACTION REQ'D BY 12PM ON 03/28/23.
2023-03-26 43 Site Activity Status Update Received Download PDF file SUMMARY OF ACTIONS PERFORMED BY K SINGH ON 3/26 - SENT TO DNR & CITY HEALTH VIA EMAIL
2023-03-26 99 Miscellaneous Download PDF file CWC'S NOTIFICATIONS TO RESIDENTS CONCERNING INDOOR AIR CONTAMINATION
2023-03-25 43 Site Activity Status Update Received Download PDF file CONSULTANT EMAILED DNR IMMEDIATE ACTION PLAN. SYSTEM TESTING/MODIFICATIONS ARE PLANNED NEXT WEEK.
2023-03-25 99 Miscellaneous Download PDF file CITY OF MILWAUKEE ORDER FOR EVACUATION & LETTER TO OCCUPANTS.
2023-03-24 99 Miscellaneous Download PDF file IMMEDIATE ACTION REQUIRED EMAIL FROM DNR TO RP AND CONSUTLANT. TCE>RESIDENTIAL VAPOR ACTION LEVEL.
2023-03-24 43 Site Activity Status Update Received Download PDF file INFO REC'D VIA EMAIL - PRESSURE FIELD EXTENSION MEASUREMENTS & CONFIRMATION SOIL DATA MAP & TABLES.
2023-03-23 43 Site Activity Status Update Received Download PDF file RESULTS OF FIRST ROUND OF PASSIVE AIR SAMPLING & PLANNED CONTINGENCY ACTIONS. TCE>RESIDENTIAL VAL.
2023-03-23 99 Miscellaneous Download PDF file EMAIL CORRESPONDENCE 03/20 - 03/23 - DNR REQUESTS UPDATE ON IA RESULTS & OCCUPANCY SCHEDULE.
2023-02-21 97 Technical Assistance Request Received (fee) Download PDF file REC'D CK #7636 $700, RESPONSE TO VAPOR COMMISSIONING PLAN REVIEW & UPDATED VAPOR MITIGATION SYSTEM
2023-02-21 98 Technical Assistance Provided Download PDF file UPDATED VMS/SVE COMMISISOING PLAN REVIEW LETTER
2023-02-17 43 Site Activity Status Update Received Download PDF file ENGINEER SIGNATURE AND CERTIFICATION FOR THE UPDATED SVE COMMISSIOING PLAN, DATED 02/08/23
2023-02-14 43 Site Activity Status Update Received Download PDF file OCCUPANCY UPDATE FROM KSINGH - KSINGH STATES OCCUPANCY IS DEPENDENT ON COMMISSIONING RESULTS.
2023-01-31 99 Miscellaneous Download PDF file PILOT TEST REPORT
2023-01-23 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2022 - 12/31/2022
2023-01-23 99 Miscellaneous Download PDF file VMS/SVE COMMISSIOING PLAN REVIEW EMAIL FROM DNR - REQUIRED AND RECOMMENDED NEXT STEPS
2023-01-23 99 Miscellaneous VIRUTAL MTG W/ DNR, DHS, CONSULTANT, & RP TO DISCUSS THE 12/28/22 SVE/VMS COMMISSIOING PLAN.
2023-01-12 99 Miscellaneous DNR ATTENDS DHS MTG W/ MILWAUKEE DEPT. OF NIEGHBORHOOD SERVICES (DNS) & MILLWAUKEE HEALTH DEPT.
2022-12-29 99 Miscellaneous Download PDF file EMAILS BTWN DNR & CONSULTANT - COMMISSIONING & OCCUPANCY SCHEDULE CLARIFICATION REQ BY DNR
2022-12-28 43 Site Activity Status Update Received Download PDF file VAPOR MITIGATION SYSTEM COMMISSIONING PLAN
2022-12-08 43 Site Activity Status Update Received Download PDF file PILOT TEST REPORT FOR VAPOR MITIGATION SYSTEM
2022-09-26 43 Site Activity Status Update Received Download PDF file GROUNDWATER MONITORING AND ADD SI
2022-07-05 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2022 - 6/30/2022
2022-06-08 43 Site Activity Status Update Received Download PDF file STATUS UPDATE GROUNDWATER MARCH 2022
2022-06-08 119 PFAS Sampling Completed - Not Detected GW SAMPLING FOR PFAS COMPLETED - NO PFAS WAS DETECTED. DATA PRESENTED IN AC 43, DATED 06/08/22.
2022-05-16 33 Tank System Site Assessment (TSSA) Report Received Download PDF file
2022-03-02 99 Miscellaneous Download PDF file EMAIL CORRESPONDENCE BETWEEN DNR AND K. SINGH - INFORMATION PROVIDED.
2022-03-01 43 Site Activity Status Update Received Download PDF file WNDR REVIEW OF SIR
2022-02-21 43 Site Activity Status Update Received Download PDF file SECOND GW MONITORING EVENT
2022-02-14 98 Technical Assistance Provided Download PDF file
2022-02-05 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2021 - 12/31/2021
2022-01-25 97 Technical Assistance Request Received (fee) Download PDF file REC'D CK #6783 $700
2021-12-22 140 Site Investigation Report (SIR) Not Approved Download PDF file
2021-12-09 199 Info. Received or Request Ended (Fee-Based or Closure) PHONE CALL BETWEEN DNR AND CONSULTANT.
2021-12-01 198 Request for Additional Information (Fee-Based or Closure) Download PDF file ADDITIONAL INFORMATION REQUESTED BY DNR VIA EMAIL
2021-11-04 137 Site Investigation Report (SIR) Received (fee) Download PDF file REC'D CK #6617 $1050
2021-07-02 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2021 - 6/30/2021
2021-06-23 99 Miscellaneous Download PDF file EMAIL CORRESPONDENCE BETWEEN DNR AND K. SINGH - VAPOR BARRIER INPUT.
2021-06-09 99 Miscellaneous Download PDF file EMAILS BETWEEN DNR AND K. SINGH - VAPOR BARRIER INPUT PROVIDED BY DNR.
2021-06-08 149 Remedial Action (RA) Design Report Approved Download PDF file
2021-06-08 98 Technical Assistance Provided SEE DOCUMENTATION FOR AC 149, DATED 06/08/21
2021-05-27 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file
2021-05-27 114 PFAS Scoping Statement Received SEE DOCUMENTATION FOR AC 35, DATED 05/27/21
2021-05-18 81 Site Investigation Workplan (SIWP) Not Approved Download PDF file
2021-05-11 99 Miscellaneous Download PDF file CONTAINED OUT DETERMINATION FOR PROPOSED MODIFICATION OF VAPOR MITIGATION /EXTRACTION SYSTEM
2021-05-10 97 Technical Assistance Request Received (fee) Download PDF file REC'D CK #6268 $700.00, VAPOR EXTRACTION AND VAPOR MITIGATION SYSTEM
2021-04-30 199 Info. Received or Request Ended (Fee-Based or Closure) Download PDF file
2021-04-28 198 Request for Additional Information (Fee-Based or Closure) Download PDF file ADDITIONAL INFO REQUEST FOR SIWP
2021-04-19 135 Site Investigation Workplan (SIWP) Received (fee) Download PDF file REC'D CK #6226 $700.00
2021-04-13 99 Miscellaneous Download PDF file EMAIL CORRESPONDENCE BETWEEN DNR AND CONSULTANT FOR IMMEDIATE NEXT STEPS FOR RA DESIGN & PLAN
2021-04-09 150 Remedial Action (RA) Design Report Not Approved Download PDF file
2021-04-06 13 Activity Reopened Download PDF file
2021-04-06 105 Continuing Obligation Modification Request Not Approved CONTINUING OBLIGATION MODIFICATION REQUEST NOT APPROVED. ACTIVITY REOPENED.
2021-03-31 99 Miscellaneous Download PDF file EMAIL TO DEVELOPER ON OPENING NEW SITE FOR THE WEST BLOCK AND REOPENING SITE ON THE EAST BLOCK
2021-03-25 43 Site Activity Status Update Received Download PDF file FEBRUARY AND MARCH 2021 ADDITIONAL SOILS INVESTIGATION
2021-03-25 199 Info. Received or Request Ended (Fee-Based or Closure) REC'D FEBRUARY AND MARCH 2021 ADDITIONAL SOILS INVESTIGATION
2021-03-24 99 Miscellaneous Download PDF file DNR EMAILS TO K. SINGH - REQUESTING UPDATE ON SOIL SAMPLE RESULTS.
2021-03-23 148 Remedial Action Design Report Received (fee) Download PDF file UPDATE TO POST CLOSURE MOD REQ/RAP. REC'D CK#6193, $1050
2021-03-17 43 Site Activity Status Update Received Download PDF file REC'D FEASIBILITY STUDY AND DESIGN - VAPOR MITIGATION SYSTEM
2021-03-04 99 Miscellaneous Download PDF file EMAIL CORRESPONDENCE BETWEEN DNR AND CONSULTANT - INFORMATION REQUESTED
2021-02-04 99 Miscellaneous Download PDF file PRESSURE FIELD EXTENSION TESTING AND SUB-SLAB DEPRESSURIZATION SYSTEM FEASIBILITY STUDY WORK PLAN
2021-01-12 99 Miscellaneous Download PDF file APPROVAL OF PASSIVE AIR SAMPLING PLAN
2021-01-12 43 Site Activity Status Update Received Download PDF file ADDITIONAL SUB-SLAB VAPOR SAMPLING INVESTIGATION
2020-12-18 99 Miscellaneous Download PDF file PASSIVE AIR SAMPLING PLAN
2020-12-11 99 Miscellaneous Download PDF file RESPONSE TO K. SINGH'S LETTER REC'D ON 12/9/20
2020-12-09 99 Miscellaneous Download PDF file RESPONSE TO WDNR REVIEW OF SUB-SLAB VAPOR INVESTIGATION WORK PLAN
2020-12-02 36 Site Investigation Workplan (SIWP) Approved Download PDF file
2020-11-23 135 Site Investigation Workplan (SIWP) Received (fee) Download PDF file REC'D CK #5943 $700.00
2020-11-12 99 Miscellaneous Download PDF file DNR ACKNOWLEDGEMENT OF ADDITIONAL VAPOR INVESTIGATION
2020-11-03 99 Miscellaneous Download PDF file REC'D NOTICE OF ADDITIONAL VAPOR INVESTIGATION
2020-09-15 99 Miscellaneous Download PDF file ADDITIONAL INFORMATION RE: DECOMMISSIONING OF SSDS AND IMPLEMENTATION OF PARKING GARAGE VENTILATION
2020-09-10 198 Request for Additional Information (Fee-Based or Closure) Download PDF file REQ'D ADD'L INFO
2020-09-03 121 PFAS Sampling Completed - Non-Actionable Levels Detected Download PDF file PFAS SOIL SAMPLING RESULTS
2020-08-03 181 Continuing Obligation Modification Request Received (fee) Download PDF file REC'D CK #5722 $1050.00
2020-08-03 710 Database Fee Paid for Soil Continuing Obligation(s) REC'D CK #5722 $300.00
2020-08-03 700 Database Fee Paid for Groundwater Continuing Obligation(s) REC'D CK #5722 $350.00
2016-07-22 185 Continuing Obligation(s) Compliance Audit Complete Download PDF file
2008-08-26 222 Continuing Obligation - Maintain Cap Over Contaminated Area
2008-08-26 224 Continuing Obligation - Structural Impediment to Cleanup
2008-08-26 56 Continuing Obligation(s) Applied Download PDF file
2008-08-26 232 Continuing Obligation - Residual Soil Contamination
2008-08-26 236 Continuing Obligation - Residual GW Contamination
2008-08-26 226 Continuing Obligation - Vapor Intrusion Response
2008-08-26 12 Activity Previous Case Closure Date
2008-08-12 99 Miscellaneous WELL ABADONMENT FRMS FOR THIS BRRTS NO, NOT 03-41-000793
2008-07-15 84 Remaining Actions Needed NEED WELL ABANDONMENT FRMS, PART OF PECFA = 88% ERP = 12% SPLIT SEE 03-41-000793
2008-04-15 99 Miscellaneous RECD ADDENDUM NO 2 FOR CLOSURE VAPOR EVALUATION RPT
2007-07-03 90 SER First In/First Out (FIFO) Review Process Started RECD ADD INFO FOR CLOSURE
2007-03-13 99 Miscellaneous ADD WORK LTR FOR KPRG TO INSTALL WELL IN CITY ROW
2007-01-22 80 Closure Not Recommended SEE 03-41-000793 LTR SENT
2006-10-11 99 Miscellaneous ADD TO 03-41-000793, PART OF PECFA CASE PECFA = 88%, ERP = 12%
2001-02-27 2 Responsible Party (RP) letter sent
2001-01-11 1 Notification of Hazardous Substance Discharge
Substances
Substance Type Amt Released Units
1,4-Dioxane Industrial Chem
Chlorinated Solvents VOC
Metals Metals
Per- and Polyfluoroalkyl Substances Industrial Chem
Polychlorinated Biphenyl PCB
Polynuclear Aromatic Hydrocarbons Petroleum
Tetrachloroethene (Perchloroethylene) VOC
Tetrachloroethene (Perchloroethylene) VOC
Trichloroethylene Industrial Chem
Volatile Organic Compounds VOC
Vapor Intrusion Continuing Obligation(s)
(A) Exceedence of Vapor Risk Levels - Vapor Mitigation Required: Vapor mitigation is required due to sub-slab or nearby soil vapor concentrations exceeding vapor risk screening levels.
Responsible Party
COMMUNITY WITHIN THE CORRIDOR LIMITED PARTNERSHIP 2 CARLSON PKWY STE 400, PLYMOUTH, MN 55447
DNR Project Manager
JANE GRAY  jane.gray@wisconsin.gov
263675 | 02-41-263675
BOTW Release 4.14 | 09/17/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages