2024-09-17
11
Activity Closed
2024-09-17
56
Continuing Obligation(s) Applied
2024-09-17
222
Continuing Obligation - Maintain Cap Over Contaminated Area
CAP MTC REQUIRED FOR DIRECT CONTACT AND TO PREVENT GW INFILTRATION
2024-09-17
226
Continuing Obligation - Vapor Intrusion Response
2024-09-17
232
Continuing Obligation - Residual Soil Contamination
2024-09-17
234
Continuing Obligation - Monitoring Well Needs Abandonment
MW WAS NOT ABLE TO BE LOCATED
2024-09-17
236
Continuing Obligation - Residual GW Contamination
2024-09-17
238
Continuing Obligation - Inspection Reports Required
VMS REQUIRES ANNUAL INSPECTION AND SUBMITTAL OF INSPECTION LOG TO DNR
2024-08-30
190
Remaining Actions Needed Requirements Met or Docs Received
MONITORING WELL AND SOIL VAPOR EXTRACTION PIPING
2024-08-22
84
Remaining Actions Needed
MONITORING WELL AND SOIL VAPOR EXTRACTION PIPING ABANDONMENT
2024-08-15
199
Info. Received or Request Ended (Fee-Based or Closure)
30 DAY PERIOD HAS PASSED FOR NOTIFICATION TO CITY FOR LOST/DESTROYED WELLS IN MATHER ST ROW
2024-08-13
99
Miscellaneous
DNR REQUESTING ADDITIONAL REVISIONS TO BE MADE TO B.3.A AND B.3.D
2024-07-31
99
Miscellaneous
DNR REQUESTING ADDITIONAL REVISIONS TO BE MADE TO CLOSURE PACKET FIGURES AND TABLES
2024-07-23
99
Miscellaneous
DNR SENT 30-DAY NOTIFICATION FOR DESTROYED WELLS TO CITY OF GREEN BAY, REQUESTING TO WAIVE 30 DAYS
2024-07-01
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2024 - 6/30/2024
2024-06-06
99
Miscellaneous
REQUEST FOR CLOSURE REVISIONS VIA EMAIL
2024-06-05
198
Request for Additional Information (Fee-Based or Closure)
DNR IS REQUIRING NOTIFICATION TO CITY OF GREEN BAY FOR LOST MONITORING WELLS IN THE ROW
2024-05-15
43
Site Activity Status Update Received
0% METHANE DETECTED AT SVE-4; DNR DOES NOT REQUIRE ADD'L METHANE INVESTIGATION
2024-05-01
99
Miscellaneous
DNR REQUESTING METHANE SAMPLING WITH 4-GAS METER FROM SVE PIPING DUE TO HIGH METHANE IN GW
+
2024-04-17
79
Case Closure Review Request Received
AUTO-ENTERED
20240417_79_Closure_Submit.zip
FINAL_REVISIONS.zip
2024-04-11
779
Case Closure Review Fee Received
2024-04-11
700
Database Fee Paid for Groundwater Continuing Obligation(s)
2024-04-11
710
Database Fee Paid for Soil Continuing Obligation(s)
2024-03-11
43
Site Activity Status Update Received
856 MATHER ST OFF-SITE NOTIFICATION FOR CLOSURE UNDELIVERABLE BY CERTIFIED MAIL; OK TO SEND VIA UPS
2024-01-16
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2023 - 12/31/2023
2023-12-14
364
VAL and/or VRSL Exceeded
2023-07-25
99
Miscellaneous
DNR RESPONSE TO RADR AND VMS OM&M PLAN; ADDITIONAL GW MONITORING AND REVISIONS NEEDED
2023-07-18
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 01/01/2023 - 06/30/2023
2023-06-07
92
Operation & Maintenance (O&M) Report Received (non-fee)
REVISED VMS OPERATION AND MAINTENANCE PLAN
2023-06-06
151
Remedial Action (RA) Documentation Report Received (non-fee)
DOCUMENTATION OF EXCAVATION AND EX-SITU TREATMENT OF CONTAMINATED SOIL
2023-06-06
119
PFAS Sampling Completed - Not Detected
SEE AC 151 FOR DOCUMENTATION; PFAS NOT DETECTED AND NO MORE PFAS SAMPLING REQUIRED
2023-04-05
147
Remedial Action (RA) Design Report Received (non-fee)
REMEDIAL ACTION PLAN FOR EXCAVATION AND IN-SITU TREATMENT TO DISPOSE AT LICENSED LANDFILL
2023-03-28
43
Site Activity Status Update Received
3RD ROUND PASSIVE VAPOR SAMPLING RESULTS FOR 856 MATHER & 714 LINCOLN BELOW STANDARDS
2023-01-09
43
Site Activity Status Update Received
VAPOR SAMPLING RESULTS SENT TO OFF-SITE RESIDENCES; 712 LINCOLN & 856 MATHER
2023-01-05
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2022 - 12/31/2022
2022-12-15
99
Miscellaneous
PHONE CONFERENCE WITH KEN JUZA, ANDY DELFORGE, ROXANNE CHRONERT, & JOSIE SCHULTZ
2022-12-01
99
Miscellaneous
DNR REQUESTING ROUND OF OFF-SITE PASSIVE VI SAMPLING, SOIL RA, MODS TO VMS OM&M PLAN & PFAS SAMPLING
2022-12-01
116
PFAS Sampling Required
SEE AC 99 OF SAME DATE FOR DOCUMENTATION
2022-09-28
43
Site Activity Status Update Received
VAPOR SAMPLING RESULTS FOR 856 MATHER & 714 LINCOLN BELOW STDS; RECENT GW MONITORING AND SOIL TCLP
2022-09-28
114
PFAS Scoping Statement Received
SEE AC 43 OF SAME DATE FOR DOCUMENTATION
2022-08-18
43
Site Activity Status Update Received
OFF-SITE VAPOR SAMPLING RESULTS FOR 864 MATHER & 714 LINCOLN RESIDENCES BELOW VRSLS & VALS
2022-07-05
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2022 - 6/30/2022
2022-03-22
99
Miscellaneous
OFF-SITE RESIDENCES ARE ALLOWING ACCESS; DNR REQUESTING PASSIVE VAPOR SAMPLING
2022-03-10
99
Miscellaneous
DNR RESPONSE THAT A SOIL REMEDIAL ACTION IS NEEDED
2022-01-11
43
Site Activity Status Update Received
SOIL & GW SAMPLING, REQUEST OFF-SITE ACCESS FOR VAPOR SAMPLING
2022-01-04
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2021 - 12/31/2021
2021-07-01
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2021 - 6/30/2021
2021-06-23
99
Miscellaneous
DNR REQUESTING ADDITIONAL SITE INVESTIGATION & DOCUMENTATION FOR SITE
2021-04-06
130
DNR Regulatory Reminder Sent
VAPOR INTRUSION AND TCE REMINDER LETTER
2021-01-05
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2020 - 12/31/2020
2020-10-28
99
Miscellaneous
VMS NEEDS OM&M PLAN & INSPECTION LOG; NEXT STEPS TO INVESTIGATE VI IN OFF-SITE RESIDENCES
2020-10-27
130
DNR Regulatory Reminder Sent
DERF FUNDING STATUS LTR
2020-10-05
126
Interim Action Report Received (non-fee)
VAPOR MITIGATION SYSTEM DOCUMENTATION & QTLY GROUNDWATER SAMPLING POST-INJECTION
2020-08-17
130
DNR Regulatory Reminder Sent
EMERGING CONTAMINANTS REMINDER LETTER
2020-07-06
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2020 - 6/30/2020
2020-03-18
151
Remedial Action (RA) Documentation Report Received (non-fee)
DOCUMENTATION OF SUMMER 2019 INJECTION & FIRST 2 ROUNDS OF GW SAMPLING POST-INJECTION
2020-01-03
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2019 - 12/31/2019
2019-11-05
217
DERF - Cost Reimbursement Application Received
2019-10-10
99
Miscellaneous
DERP REMEDIAL ACTION CHANGE ORDER #3 APPROVAL-INSTALL REPLACEMENT WELLS DESTROYED IN ROAD CONST
2019-09-16
112
DERF - Change Order Received
REQUEST TO REPLACE MONITORING WELLS DESTROYED DURING ROAD CONSTRUCTION
2019-07-16
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2019 - 6/30/2019
2019-05-09
64
Inject/Infiltrate Request Approved
2019-04-19
63
Inject/Infiltrate Request Received (fee)
2019-02-11
99
Miscellaneous
CHANGE IN PROJECT MANAGER (SCHULTZ)
2019-01-18
99
Miscellaneous
APPROVAL OF CAP 18 PROPOSED REMEDIAL ACTION
2019-01-03
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2018 - 12/31/2018
2018-12-17
43
Site Activity Status Update Received
GROUNDWATER SAMPLING RESULTS
2018-10-16
99
Miscellaneous
DNR APPROVAL OF PROPOSED COST
2018-09-12
43
Site Activity Status Update Received
DERF COST ESTIMATE FOR GROUNDWATER MONITORING & REMEDIAL ACTION
2018-08-14
99
Miscellaneous
APPROVAL OF NEW CONSULTANT SELECTION (REI ENGINEERING)
2018-06-27
7
Environmental Consultant Hired
REI ENGINEERING INC
2018-01-31
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2017 - 12/31/2017
2017-08-08
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2017 - 6/30/2017
2017-05-05
99
Miscellaneous
APPROVAL OF MACH IV RA PROPOSAL DATED 04/01/2017
2017-04-20
113
DERF - Bid Review Request Received
REQUEST TO HIRE MACH IV
2017-01-27
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2016 - 12/31/2016
2016-12-02
43
Site Activity Status Update Received
BUILDING IS CURRENTLY VACANT. ANTICIPATED CONSULTANT INTENDS TO GET THIS SITE MOVING AGAIN.
2016-08-01
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2016 - 6/30/2016
2016-07-12
99
Miscellaneous
RP SHOULD HAVE CONSULTANT SUBMIT A SOW & DERF COST ESTIMATE FOR DNR APPROVAL
2016-07-11
43
Site Activity Status Update Received
REQUEST TO HIRE NEW CONSULTANT
2016-06-24
43
Site Activity Status Update Received
REQUEST TO CHANGE CONSULTANTS WILL BE SUBMITTED TO DNR IN THE NEAR FUTURE
2016-05-17
43
Site Activity Status Update Received
NEW CONSULTANT & COST ESTIMATE TO BE SUBMITTED TO DNR IN THE NEAR FUTURE
2016-02-16
43
Site Activity Status Update Received
SEEKING NEW CONSULTANT
2015-06-02
99
Miscellaneous
REQUEST FOR CASE STATUS UPDATE
2015-06-02
43
Site Activity Status Update Received
POTENTIAL TO HIR A NEW CONSULTANT
2014-07-24
43
Site Activity Status Update Received
RP TO CONTACT CONSULTAN TO COLLECT A ROUND OF GROUNDWATER SAMPLES
2014-07-14
99
Miscellaneous
REQUEST FOR CASE STATUS UPDATE
2014-01-30
130
DNR Regulatory Reminder Sent
DERF FUNDING STATUS LTR
2013-04-10
99
Miscellaneous
REQUEST FOR CASE STATUS UPDATE
2013-01-25
43
Site Activity Status Update Received
RP/DNR MEETING TO DISCUSS SITE STATUS
2013-01-16
99
Miscellaneous
REQUEST FOR CASE STATUS UPDATE
2012-09-10
99
Miscellaneous
DOT REPORTS AND NOTES
2012-01-17
99
Miscellaneous
REQUEST FOR RP TO CONTACT DNR TO DISCUSS NOVEMBER 2011 RA CHANGE ORDER
2012-01-17
43
Site Activity Status Update Received
RP OK WITH RA APPROACH OUTLINED IN NOV 2011 SHAW SUBMITTAL
2012-01-17
99
Miscellaneous
DNR PROVIDED COMMENTS AND REQUESTED ADDITIONAL INFO REGARDING NOV 2011 RA CHANGE ORDER
2011-12-22
99
Miscellaneous
REQUEST FOR RP TO CONTACT THE DNR TO DISCUSS 11/22/11 CHANGE ORDER REQUEST
2011-11-22
112
DERF - Change Order Received
2011-09-08
130
DNR Regulatory Reminder Sent
Vapor Intrusion (VI) Assessment Notification Ltr Sent
2011-07-25
217
DERF - Cost Reimbursement Application Received
2011-01-04
99
Miscellaneous
RP AGREED TO HAVE CONSULTANT SUBMIT COSTS FOR ADDITIONAL REMEDIAL ACTION
2010-11-22
43
Site Activity Status Update Received
GROUNDWATER AND AIR SAMPLING DATA
2010-06-02
99
Miscellaneous
REQUEST FOR MODIFICATIONS TO 4/26/10 CHANGE ORDER REQUEST
2010-05-26
218
DERF - Cost Reimbursement Application Approved
AUDIT OF 2ND RA CLAIM (DC-359) COMPLETE, REIMBURSEMENT CHECK TO BE SENT ASAP.
2010-04-26
112
DERF - Change Order Received
REQUEST FOR VAPOR & UTILITY ASSESSMENT
2010-03-31
29
Phase II Environmental Site Assessment (ESA) Rpt Received
DOT PROJECT ID: #1450-04-00 (GREEN BAY), 1450-06-00 (HOWARD)
2010-03-19
93
Operation & Maintenance (O&M) Report Approved
ADDITIONAL INFORMATION TO BE SUBMITTED
2010-02-23
217
DERF - Cost Reimbursement Application Received
2010-02-23
92
Operation & Maintenance (O&M) Report Received (non-fee)
2009-05-08
99
Miscellaneous
CHECK FOR REIMB CLAIM DC-248 (RCVD 12/07, RA #1) ISSUED 5/8/09
2009-05-07
43
Site Activity Status Update Received
REMEDIAL ACTION ACTIVITIES TO RESUME NOW THAT DERP REIMBURSEMENT IS TO TAKE PLACE MAY OR JUNE 2009
2009-04-15
99
Miscellaneous
REQUEST FOR CASE STATUS UPDATE
2008-11-24
43
Site Activity Status Update Received
REMEDIATION SYSTEM HAS BEEN SHUT DOWN FOR WINTER & WILL RESTART IN SPRING 2009
2008-10-06
43
Site Activity Status Update Received
GW SAMPLES COLLECTED APRIL 2008. SYSTEM TO RUN UNTIL LATE NOVEMBER BEFORE BEING SHUT OFF FOR WINTER.
2008-03-28
218
DERF - Cost Reimbursement Application Approved
AUDIT OF CLAIM #2 COMPLETE. REIMB CHECK NOT YET SENT, NO FUNDS AVAILABLE. WILL BE ISSUED ASAP
2008-03-12
43
Site Activity Status Update Received
REMEDIAT SYSTEM TURNED OFF OVER WINTER. RESTART IN SPRING. GW SAMPLES COLLECTED PRIOR TO START UP.
2007-05-21
43
Site Activity Status Update Received
SYSTEM RETROFITS BEING IMPLEMENTED. SYSTEM T/BE RUNNING IN NEAR FUTURE.
2007-05-11
43
Site Activity Status Update Received
SVE SYSTEM TO BE INSTALLED ON 06-04-2007
2007-04-05
43
Site Activity Status Update Received
CONSULTANT IS PREPARING BID SPECS
2007-02-14
43
Site Activity Status Update Received
GATHERING SUBCONTRACTOR BIDS. CONSTRUCTION ANTICIPATED FOR SPRING 2007,
2006-11-07
112
DERF - Change Order Received
REMEDIAL ACTION CHANGE ORDER #1
2006-09-21
43
Site Activity Status Update Received
RESPONSE TO DNR QUESTIONS
2006-09-14
43
Site Activity Status Update Received
CONSULTANT TO RESPOND TO DNR'S REQUEST THE WEEK OF SEPT 18, 2006
2006-09-12
99
Miscellaneous
REQUEST FOR ADDITIONAL INFORMATION
2006-08-30
112
DERF - Change Order Received
2006-08-30
147
Remedial Action (RA) Design Report Received (non-fee)
REMEDIAL DESIGN REPORT
2006-05-05
43
Site Activity Status Update Received
REPORT AND CHANGE ORDER TO BE SUBMITTED BY JUNE 1, 2006
2006-05-03
99
Miscellaneous
REQUEST FOR CASE STATUS UPDATE
2006-03-28
3
Notice of Noncompliance (NON) Issued
2005-08-30
99
Miscellaneous
REQUEST FOR CASE STATUS UPDATE
2004-11-08
43
Site Activity Status Update Received
UPDATE ON GW DISPOSAL & RAP
2004-04-28
218
DERF - Cost Reimbursement Application Approved
AUTO-POPULATED BY CAOS
2004-03-22
99
Miscellaneous
SUB-SLAB DEPRESSURIZATION SYSTEM NO LONGER NEEDED AT ADJACENT PROPERTY
2004-03-05
217
DERF - Cost Reimbursement Application Received
REIMURSEMENT PACKET SENT TO SOELLNER ON 03-08-2004
2004-01-30
43
Site Activity Status Update Received
ADDITIONAL BID INFORMATION FROM ONE RA BIDDER
2004-01-27
99
Miscellaneous
REQUEST FOR ADDITIONAL INFOMATION FROM BIDDERS
2004-01-23
113
DERF - Bid Review Request Received
2003-12-23
43
Site Activity Status Update Received
2 RA PROPOSALS. 3 MORE WILL BE COMING.
2003-10-27
146
Remedial Action Plan Go Ahead (Notice to Proceed)
2003-10-21
39
Remedial Action Options Report (RAOR) Received (non-fee)
REVISED RAOR. PAPER COPY.
2003-10-16
39
Remedial Action Options Report (RAOR) Received (non-fee)
REVISED RAOR. ELECTRONIC VERSION.
2003-10-16
99
Miscellaneous
DNR PROVIDED COMMENTS TO REVISED RAOR.
2003-10-13
99
Miscellaneous
DNR PROVIDED COMMENTS TO REVISED RAOR.
2003-10-08
39
Remedial Action Options Report (RAOR) Received (non-fee)
REVISED RAOR. ELECTRONIC VERSION.
2003-09-24
38
Site Investigation Report (SIR) Approved
2003-09-24
82
Remedial Action Options Report (RAOR) Not Approved
DNR COMMENTS SENT TO NORTHERN ENVIRONMENTAL
2003-09-22
39
Remedial Action Options Report (RAOR) Received (non-fee)
2003-09-18
37
Site Investigation Report (SIR) Received (non-fee)
2003-09-18
43
Site Activity Status Update Received
RAP WILL BE MAILED TO DNR ON 09/19/03
2003-08-07
43
Site Activity Status Update Received
DHFS LETTER SUMMARIZING VAPOR INTRUSION POTENTIAL
2003-07-08
43
Site Activity Status Update Received
EMAIL SUMMARIZING SI ANALYTICAL RESULTS
2003-06-02
43
Site Activity Status Update Received
HAZARDOUS WASTE DETERMINATION
2003-06-02
216
DERF - Contained-in Rulings Review Request Received
2003-05-30
35
Site Investigation Workplan (SIWP) Received (non-fee)
PROPOSAL FOR ADDITIONAL SI ACTIVITIES
2003-05-30
112
DERF - Change Order Received
SITE INVESTIGATION ACTIVITIES
2003-05-20
99
Miscellaneous
DNR RECOMMENDATIONS REGARDING 05/15/2003 E-MAIL
2003-05-15
43
Site Activity Status Update Received
E-MAIL UPDATING DNR ON ADDITIONAL SI ACTIVITIES & PROPOSED WORK
2003-03-11
43
Site Activity Status Update Received
LETTER FROM AGENT TO FORMER OWNER REGARDING WASTE DETERMINATION
2003-02-27
43
Site Activity Status Update Received
CONSULTANT RQT TO OFF-SITE PROP OWNER REQUESTING ACCESS TO INSTALL SOIL BORINGS
2003-02-26
43
Site Activity Status Update Received
REQUEST TO ADD AREA TO CITY'S DATABASE/MASTER PLAN
2003-02-26
43
Site Activity Status Update Received
LTR NOTIFYING CITY OF POTENTIAL FOR CONTAMINANTS IN STREET
2003-02-14
112
DERF - Change Order Received
SITE INVESTIGATION ACTIVITIES
2003-01-16
99
Miscellaneous
DNR PROVIDED COMMENTS ON 01/06/03 SUBMITTAL
2003-01-06
43
Site Activity Status Update Received
COPY OF LATEST SOIL & GW ANALYTICAL RESULTS
2002-12-12
43
Site Activity Status Update Received
RESPONSE FROM CITY DENYING REQUEST FOR OFF-SITE ACCESS
2002-12-05
43
Site Activity Status Update Received
LTR TO CITY OF GREEN BAY REQUESTING OFF-SITE ACCESS FOR SB & MW INSTALLATION
2002-12-04
99
Miscellaneous
RESPONSE TO OFF-SITE PROPERTY OWNER REGARDING ACCESS
2002-11-27
43
Site Activity Status Update Received
RESPONSE FROM OFF-SITE PROP. OWNER RE: RP'S RQT TO INSTALL GW MONITORING WELL
2002-11-18
112
DERF - Change Order Received
SITE INVESTIGATION ACTIVITIES
2002-11-11
99
Miscellaneous
ADDITIONAL WORK SHOULD PROCEED WITH CONDITIONS
2002-11-06
43
Site Activity Status Update Received
SUMMARY OF LATEST SI RESULTS & PROPOSAL FOR ADDITIONAL WORK
2002-10-22
43
Site Activity Status Update Received
ORIGINAL DERF POTENTIAL CLAIM NOTIFICATION FORM FOR AGENT AGREEMENT
2002-10-22
110
DERF - Potential Claim Form Approved
WITH AGENT AGREEMENT
2002-09-25
30
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
WITH CONDITIONS
2002-09-20
35
Site Investigation Workplan (SIWP) Received (non-fee)
2002-07-24
110
DERF - Potential Claim Form Approved
2002-07-23
43
Site Activity Status Update Received
PREPARING AGENT AGREEMENT & POTENTIAL CLAIM NOTIFICATION FORM
2002-07-18
43
Site Activity Status Update Received
UPDATED/FINAL SI COST PROPOSAL FROM NORTHERN ENVIRONMENTAL
2002-07-10
43
Site Activity Status Update Received
NORTHERN ENV RETAINED. RP SUBMITTING AGENT AGREEMENT TO WDNR
2002-06-27
99
Miscellaneous
DENIAL OF RP REQUEST TO USE HIGHEST BIDDER FOR SI
2002-05-20
43
Site Activity Status Update Received
REVISED NORTHERN ENVIRONMENTAL DERF SI PROPOSAL
2002-05-03
43
Site Activity Status Update Received
REVISED ARCADIS DERF SI PROPOSAL
2002-04-30
43
Site Activity Status Update Received
REVISED ALPHA TERRA DERF SI PROPOSAL
2002-04-15
99
Miscellaneous
REQUEST FOR ADDITIONAL INFORMATION REGARDING SI PROPOSALS
2002-04-11
43
Site Activity Status Update Received
DERF SI PROPOSALS
2002-04-11
113
DERF - Bid Review Request Received
2001-08-09
43
Site Activity Status Update Received
COPY OF REQUEST FOR PROPOSAL LETTERS
2001-06-21
43
Site Activity Status Update Received
GW MONITORING RESULTS
2001-05-15
43
Site Activity Status Update Received
WILL BE COLLECTING ANOTHER ROUND OF GW
2000-06-21
43
Site Activity Status Update Received
GW MONITORING DATA
1999-08-20
43
Site Activity Status Update Received
APPLYING FOR DERP - 3 CONSULTANT PROPOSALS
1999-07-22
43
Site Activity Status Update Received
1999-07-06
43
Site Activity Status Update Received
1999-03-25
2
Responsible Party (RP) letter sent
1999-03-22
1
Notification of Hazardous Substance Discharge
1999-03-22
111
DERF - Site Investigation Scoping Report Received