WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
02-37-000017 WAUSAU GW CONTAMINATION (SF NPL)
Activity Type / Status Jurisdiction
ERP  OPEN DNR RR
Location Name County DNR Region
WAUSAU CTY WELL FIELD SUPERFUND MARATHON WEST CNTRL
Address Municipality
E RANDOLPH & CHERRY STS WAUSAU
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NE 1/4 of the SE 1/4 of Sec 23, T29N, R07E 44.977785 -89.633284 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
UNKNOWN
Facility ID PECFA No. EPA ID Start Date End Date
737105820 WID980993521 1983-02-15
Characteristics
Above Ground
Petrol Tank

Drycleaner
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Superfund
NPL Site
Underground
Petrol Tank
WI DOT
Site
  Superfund NPL Flag
Additional Information
Description URL
Wausau GW Contam. EPA Superfund NPL/SAA Website This EPA website contains additional information about this Activity. https://www.epa.gov/superfund/wausau-groundwater [Exit DNR]
Actions and Documents
Date Code Name File Comment
2025-03-31 99 Miscellaneous Download PDF file EMAIL FROM EPA TO CONSULTANT REQUESTING UPDATED PROPOSAL FOR REMEDIAL WELL (CW-3) SHUTDOWN.
2025-03-28 43 Site Activity Status Update Received Download PDF file VAPOR LAB DATA REC'D FOR FEBRUARY 2025 VAPOR INVESTIGATION
2025-03-26 43 Site Activity Status Update Received Download PDF file 2024 ANNUAL GROUNDWATER MONITORING REPORT
2025-03-20 326 Superfund Five Year Review Report Signed Download PDF file EPA'S SEVENTH FIVE YEAR REVIEW
2025-03-10 99 Miscellaneous Download PDF file EMAILS BTWN DNR, EPA, & CONSUTLANT - CONSUTLANT/CITY REQUESTS SHUTDOWN OF REMEDIAL WELL CW-3.
2025-02-26 99 Miscellaneous DNR & EPA PERFORM SITE VISIT - OBSERVE VAPOR INVESTIGATION BY GHD AT WEST BANK ON 02/26 & 02/27.
2025-02-21 99 Miscellaneous Download PDF file REVISED VAPOR WORK PLAN
2025-02-03 99 Miscellaneous Download PDF file VAPOR AND METHANE WORK PLAN SUBMITTED TO EPA AND DNR
2025-01-25 99 Miscellaneous Download PDF file GHD FORWARDED CW-3 SHUTODOWN REQUEST TO DNR AND EPA. ORIGINAL REQUEST DATED 01/02/2020
2025-01-24 99 Miscellaneous Download PDF file EMAIL FORWARDED TO DNR ON 01/24/25. GHD REQUESTS EPA APPROVAL TO PAVE AREA ON EAST BANK.
2024-11-19 99 Miscellaneous Download PDF file EPA FORWARDED DNR EMAIL - EPA PROVIDING GHD INPUT ON PLANS TO PAVE AREA OF EAST BANK.
2024-11-04 99 Miscellaneous Download PDF file CITY OF WAUSAU RESPONSE TO EPA'S 104(E) REQUEST, DATED 08/06/24.
2024-10-24 99 Miscellaneous Download PDF file EMAIL FROM EPA - APPROVAL TO PERFORM PAVING OPERATIONS.
2024-09-25 99 Miscellaneous Download PDF file EMAIL FROM GHD TO EPA - REQUEST TO PAVE AREA ON EAST BANK OF RIVER FOR OVERFLOW PARKING.
2024-09-20 99 Miscellaneous Download PDF file EMAIL CORRESPONDENCE REGARDING WEST BANK VAPOR SAMPLING PLAN.
2024-09-09 99 Miscellaneous Download PDF file VAPOR WORK PLAN PROPOSED BY EPA
2024-08-12 99 Miscellaneous EPA AND DNR PERFORM SITE VISIT WITH RPS AND GHD FOR 5 YR REVIEW.
2024-08-06 99 Miscellaneous Download PDF file 104(E) INFORMATION REQUEST LETTER FROM EPA TO 3M
2024-08-06 99 Miscellaneous Download PDF file 104(E) INFORMATION REQUEST LETTER FROM EPA TO CITY OF WAUSAU
2024-08-06 99 Miscellaneous Download PDF file 104(E) INFORMATION REQUEST LETTER FROM EPA TO REGAL BELOIT
2024-08-06 99 Miscellaneous Download PDF file 104(E) INFORMATION REQUEST LETTER FROM EPA TO WAUSAU CHEM CO
2024-06-02 99 Miscellaneous Download PDF file GW RPT COMMENTS
2024-05-23 99 Miscellaneous Download PDF file VI SOURCE PLAN
2024-05-23 99 Miscellaneous Download PDF file VI SUMMARY REPORT 32023 TO 42023
2024-05-15 99 Miscellaneous Download PDF file MONTHLY CALL SUMMARY
2024-05-15 99 Miscellaneous Download PDF file MONTHLY CALL VI SUMMARY
2024-05-14 99 Miscellaneous Download PDF file PRIORITIES
2024-04-29 99 Miscellaneous Download PDF file GW PFAS ADJACENT
2024-04-25 99 Miscellaneous Download PDF file GW PFAS
2024-04-25 99 Miscellaneous Download PDF file GW PFAS 2
2024-04-19 99 Miscellaneous Download PDF file VI TEAM
2024-04-17 99 Miscellaneous Download PDF file EW-1 DISCONTINUED
2024-04-15 99 Miscellaneous Download PDF file 5-YEAR NOTIFICATION
2024-04-15 99 Miscellaneous Download PDF file VI EXCEEDANCE UPDATE
2024-04-15 99 Miscellaneous Download PDF file VI EXCEEDANCE UPDATE 2
2024-04-12 99 Miscellaneous Download PDF file VAPOR UPDATE REC'D
2024-04-12 99 Miscellaneous Download PDF file GW RPT UPDATE REC'D
2024-04-12 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file VAPOR ASSESSMENT WORKPLAN REC'D
2024-03-27 99 Miscellaneous Download PDF file DEED AND SALE DISCUSSION
2024-03-18 43 Site Activity Status Update Received Download PDF file ANNUAL GW RPT REC'D
2024-03-15 314 Superfund Decision Document (ROD or ESD) - See Description Download PDF file ESD
2024-03-12 99 Miscellaneous Download PDF file PRELIMINARY VI RESULTS
2024-03-07 99 Miscellaneous Download PDF file LEAD RESULTS
2024-03-07 99 Miscellaneous Download PDF file DEED RESTRICTION INQUIRY
2024-03-05 314 Superfund Decision Document (ROD or ESD) - See Description Download PDF file ESD CONCURRENCE LTR SENT
2024-02-02 99 Miscellaneous Download PDF file EPA REQ FOR ADDT'L INFORMATION
2024-01-31 99 Miscellaneous Download PDF file VAPOR WORKPLAN
2024-01-22 364 VAL and/or VRSL Exceeded
2024-01-16 99 Miscellaneous CONDUCTED SITE VISIT WITH EPA & GHD
2024-01-05 99 Miscellaneous Download PDF file EPA REQUEST
2024-01-05 99 Miscellaneous Download PDF file PFAS DATA
2024-01-04 99 Miscellaneous Download PDF file NEW RPM
2023-12-08 99 Miscellaneous Download PDF file EPA VI REPORT COMMENTS
2023-12-01 43 Site Activity Status Update Received Download PDF file DECEMBER 2023 VAPOR INTRUSION EVALUATION SUMMARY REPORT
2023-08-04 99 Miscellaneous Download PDF file 2023 VI EVALUATION WORKPLAN ADDENDUM 2
2023-05-31 43 Site Activity Status Update Received Download PDF file MAY 2023 VAPOR INTRUSION EVALUATION SUMMARY REPORT
2023-03-03 99 Miscellaneous Download PDF file PARTIAL EPA APPROVAL OF JANUARY 2023 VI WORKPLAN
2023-02-16 99 Miscellaneous Download PDF file 2023 VI ASSESSMENT WORK PLAN APPROVED
2023-02-16 43 Site Activity Status Update Received Download PDF file 2022 ANNUAL GROUNDWATER MONITORING REPORT
2023-01-31 99 Miscellaneous Download PDF file 2023 VI ASSESSMENT WORK PLAN
2023-01-19 43 Site Activity Status Update Received Download PDF file EPA REQUEST FOR ADDITIONAL VAPOR SAMPLING
2022-10-25 43 Site Activity Status Update Received Download PDF file QUATERLY PROGRESS REPORT #10 JULY-SEPTEMBER 2022
2022-06-06 99 Miscellaneous Download PDF file CITIZEN CONTACT VOC CONCENTRATIONS
2022-05-10 114 PFAS Scoping Statement Received Download PDF file
2022-04-14 43 Site Activity Status Update Received Download PDF file 2021 ANNUAL VAPOR INTRUSION EVALUATION REPORT
2022-02-02 43 Site Activity Status Update Received Download PDF file QUARTERLY REPORT #8 OCTOBER 2021 TO DECEMBER 2021
2021-12-08 43 Site Activity Status Update Received Download PDF file VAPOR INTRUSTION EVALUAITON REPORT
2021-12-03 43 Site Activity Status Update Received Download PDF file QUARTERLY REPORT #7 JULY THROUGH SEPTEMBER 2021
2021-09-08 99 Miscellaneous Download PDF file WAUSAU DRINKING WATER TREATMENT PLANT MODIFICATION APPROVAL
2021-08-25 43 Site Activity Status Update Received Download PDF file VAPORT INTRUSION REPORT 2020
2021-08-13 43 Site Activity Status Update Received Download PDF file 2020 ANNUAL GROUNDWATER MONITORING REPORT
2021-08-02 99 Miscellaneous Download PDF file CONDITIONAL EPA APPROVAL - WAUSAU DWTF
2021-07-09 99 Miscellaneous Download PDF file NR700 SERIES PROCESS QUESTION
2021-07-01 43 Site Activity Status Update Received Download PDF file QUARTERLY PROGRESS REPORT NO. 6
2021-04-13 43 Site Activity Status Update Received Download PDF file QUARTERLY PROGRESS REPORT #5 OCT-DEC 2020
2021-04-06 130 DNR Regulatory Reminder Sent Download PDF file VAPOR INTRUSION AND TCE REMINDER LETTER
2020-08-26 43 Site Activity Status Update Received Download PDF file WC3, WCR, WC5 AND IWD ABANDONMENT
2020-08-17 130 DNR Regulatory Reminder Sent Download PDF file EMERGING CONTAMINANTS REMINDER LETTER
2020-07-27 43 Site Activity Status Update Received Download PDF file 2020 2ND QUARTER REPORT
2020-07-14 43 Site Activity Status Update Received Download PDF file DOCUMENTATION OF MONITORING WELL ABANDONMENT AND SEALING
2020-04-09 326 Superfund Five Year Review Report Signed Download PDF file
2020-03-02 43 Site Activity Status Update Received Download PDF file 2019 ANNUAL MONITORING REPORT
2019-09-26 99 Miscellaneous Download PDF file NOTICE OF PURCHASE AGREEMENT - WAUSAU CHEMICAL AND CITY OF WAUSAU
2019-05-09 43 Site Activity Status Update Received Download PDF file EW-1 SHUTDOWN PILOT STUDY ADDENDUM
2019-05-06 99 Miscellaneous DRAFT EW-1 SHUTDOWN RPT
2019-01-03 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2018 - 12/31/2018
2018-10-31 99 Miscellaneous Download PDF file SUB-SLAB/INDOOR AIR RESULTS LTRS (5)
2018-10-31 99 Miscellaneous Download PDF file REQUEST FOR ACCESS LTRS (5)
2018-07-09 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2018 - 6/30/2018
2018-02-28 43 Site Activity Status Update Received Download PDF file 2017 ANN MONITORING RPT
2018-01-26 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2017 - 12/31/2017
2018-01-18 43 Site Activity Status Update Received EW SHUTDOWN PILOT STUDY ADDENDUM
2017-11-15 99 Miscellaneous SITE VISIT & MTG W/USA EPA & CONSULTANT
2017-05-23 99 Miscellaneous Download PDF file SUB-SLAB & IA SAMPLING RESULTS SENT TO RESIDENTS
2017-04-19 43 Site Activity Status Update Received Download PDF file 2016 ANNUAL MONITORING RPT
2017-03-03 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file REVISED VAPOR INTRUSION EVALUATION WORK PLAN RECD
2016-10-13 43 Site Activity Status Update Received Download PDF file REVISED 2015 ANNUAL MONITORING REPORT REC
2016-03-24 35 Site Investigation Workplan (SIWP) Received (non-fee) VI EVAL WORK PLAN RECD
2016-03-07 43 Site Activity Status Update Received 2015 ANN MONITORING REPORT REC
2015-09-08 305 Superfund Enforcement Documents - See Description LIMITED SI RESULTS RECEIVED FROM WAUSAU CHEMICAL PROPERTY
2015-04-09 326 Superfund Five Year Review Report Signed Download PDF file
2015-04-08 43 Site Activity Status Update Received Download PDF file SITE INVESTIGATION RESULTS
2015-03-05 43 Site Activity Status Update Received Download PDF file 2014 ANNUAL RPT AND EW1 PILOT STUDY 2014
2015-01-23 99 Miscellaneous Download PDF file CORRESPONDENCE FROM 2015 THRU 2019
2014-10-29 43 Site Activity Status Update Received WAUSAU GW CONTAMINATION/EW1 SHUTDOWN PILOT STUDY 3RD QTR RESULTS REC'D
2014-10-21 43 Site Activity Status Update Received E23A WELL ABANDONMENT REPORT RECEIVED
2014-07-28 43 Site Activity Status Update Received EW1 SHUTDOWN PILOT STUDY 2ND QTR RESULTS REC'D
2014-07-25 99 Miscellaneous REC'D REQUEST TO ABANDON E23A
2014-05-19 402 Historic Fill Case by Case Exemption Issued CASE BY CASE EXEMPTION APPROVAL LTR ISSUED. WPS POLE INSTALLATION ON FMR LF
2014-05-16 401 Historic Fill Case by Case Exemption Request (fee) CH# 900262349
2014-05-01 43 Site Activity Status Update Received Download PDF file EW1 SHUTDOWN PILOT STUDY QUARTERLY REPORTS FOR 2014
2014-04-07 99 Miscellaneous LETTER TO CITY OF WAUSAU & EPA ADDRESSING REDEVELOPMENT OF WAUSAU CHEMICAL PROPERTY
2014-03-19 99 Miscellaneous CONF CALL W/ EPA TO DISCUSS REDEVELOPMENT OF WAUSAU CHEMICAL PROPERTY
2014-03-06 99 Miscellaneous MEETING W/ CITY OF WAUSAU TO DISCUSS REDEVELOPMENT OF WAUSAU CHEMICAL PROPERTY
2014-02-11 43 Site Activity Status Update Received Download PDF file 2013 ANNUAL REPORT
2014-01-31 99 Miscellaneous CONF CALL TO DISCUSS SITE REDEVELOPMENT PLANS
2013-09-09 99 Miscellaneous Download PDF file EW1 SHUTDOWN PILOT STUDY WORK PLAN REC'D
2013-06-18 99 Miscellaneous CONF CALL W/ EPA & CONSULTANT
2013-06-06 99 Miscellaneous RESPONSE TO COMMENTS REC'D
2013-06-05 99 Miscellaneous DRAFT PILOT STUDY PROPOSAL REC'D
2013-05-31 99 Miscellaneous HISTORICAL GW DATA REC'D
2013-05-30 43 Site Activity Status Update Received Download PDF file 2012 ANNUAL REPORT
2013-05-20 99 Miscellaneous REQUEST TO ABANDON WC-3 REC'D
2013-05-17 99 Miscellaneous CONF CALL W/ EPA & CONSULTANT
2013-04-26 99 Miscellaneous CONF CALL W/ EPA & CONSULTANT
2013-04-26 99 Miscellaneous COMMENTS PROVIDED ON DRAFT EW1 PILOT STUDY PROPOSAL
2013-04-24 43 Site Activity Status Update Received 1ST QTR 2013 EW-1 TREATMENT & DISCHARGE RESULTS REC'D
2013-04-23 43 Site Activity Status Update Received 2012 ANNUAL MONITORING REPORT REC'D
2013-03-15 99 Miscellaneous CONF CALL W/ EPA, CONSULTANT RE: EW1 SHUTDOWN
2013-03-01 99 Miscellaneous DRAFT EVALUATION EW1 SHUTDOWN REC'D
2013-02-08 99 Miscellaneous CONF CALL W/ EPA, CONSULTANT RE: EW1 SHUTDOWN
2012-10-17 99 Miscellaneous 3RD QTR 2012 EW1 TREATMENT & DISCHARGE RESULTS REC'D
2012-10-16 99 Miscellaneous HISTORICAL GW RESULTS & WELL LOGS REC'D FROM CONSULTANT
2012-10-10 99 Miscellaneous EMAIL TO USEPA RPM FOLLOW UP FROM SITE VISIT
2012-09-26 99 Miscellaneous SITE VISIT W/ EPA RPM & CONSULTANT
2012-09-19 99 Miscellaneous E24/E24A MW ABANDONMENT & REPLACEMENT DOCUMENTATION REC'D
2012-05-03 99 Miscellaneous EMAIL TO EPA RPM CONCURRING W/ CONSULTANT RECOMMENDATIONS
2012-04-25 43 Site Activity Status Update Received Download PDF file 2011 ANNUAL REPORT
2012-04-05 43 Site Activity Status Update Received 1ST QTR 2012 EW- 1 TREATMENT & DISCHARGE RESULTS REC'D
2012-01-10 43 Site Activity Status Update Received 4TH QRT 2011 EW1 TREATMENT & DISCHARGE RESULTS REC'D
2011-10-19 43 Site Activity Status Update Received 3RD QRT 2011 EW1 TREATMENT & DISCHARGE RESULTS REC'D
2011-09-07 130 DNR Regulatory Reminder Sent Download PDF file Vapor Intrusion (VI) Assessment Notification Ltr Sent
2011-07-26 43 Site Activity Status Update Received 1ST & 2ND QUARTER 2011 EW1 TREATMENT & DISCHARGE RESULTS RECEIVED; NEW PUMP & WELL REHAB
2011-04-05 43 Site Activity Status Update Received Download PDF file 2010 ANNUAL REPORT
2011-01-28 43 Site Activity Status Update Received 4TH QTR 2010 EW1 TREATMENT & DISCHARGE RESULTS REC'D.
2010-12-28 402 Historic Fill Case by Case Exemption Issued
2010-12-28 805 Historic Waste Site AUTO-ADDED
2010-11-18 401 Historic Fill Case by Case Exemption Request (fee) CK# 595883
2010-11-03 99 Miscellaneous SITE VISIT
2010-10-14 43 Site Activity Status Update Received 3RD QTR 2010 EW1 TREATMENT & DISCHARGE RESUTLS.
2010-07-29 149 Remedial Action (RA) Design Report Approved
2010-07-29 220 Continuing Obligation - Soil at Industrial Levels
2010-07-29 222 Continuing Obligation - Maintain Cap Over Contaminated Area
2010-07-29 224 Continuing Obligation - Structural Impediment to Cleanup
2010-07-29 228 Continuing Obligation - Site Specific Condition GW PUMP & TREAT ON MARATHON ELECTRIC COP PARCEL.
2010-07-29 56 Continuing Obligation(s) Applied Download PDF file
2010-07-29 232 Continuing Obligation - Residual Soil Contamination
2010-07-29 236 Continuing Obligation - Residual GW Contamination
2010-07-29 50 Groundwater Use Restriction Potentially Filed
2010-07-19 43 Site Activity Status Update Received SECOND QUARTER 2010 EW1 TREATMENT & DISCHARGE RESULTS REC'D.
2010-04-16 43 Site Activity Status Update Received FIRSTS QTR 2010 EWI TREATMENT & DISCHARGE RESULTS REC'D.
2010-04-09 326 Superfund Five Year Review Report Signed Download PDF file
2010-03-08 43 Site Activity Status Update Received Download PDF file 2009 ANNUAL REPORT
2010-01-15 43 Site Activity Status Update Received 4TH QTR EW1 TREATMENT & DISCHARGE RESULTS REC'D.
2009-11-09 43 Site Activity Status Update Received 3RD QTR EW1 TREATMENT & DISCHARGE RESULTS REC'D.
2009-07-06 43 Site Activity Status Update Received 2ND QTR EW1 TREATMENT & DISCHARGE RESULTS REC'D.
2009-06-22 43 Site Activity Status Update Received 2008 ANNUAL REPORT
2009-06-22 43 Site Activity Status Update Received Download PDF file 2008 ANNUAL REPORT
2009-04-23 43 Site Activity Status Update Received FIRST QUARTER PROGRESS REPORT
2009-04-17 43 Site Activity Status Update Received Download PDF file 2005 AND 2006 BIENNIAL REPORT
2009-02-27 43 Site Activity Status Update Received 2007 ANNUAL MONTIROING REPORT.
2009-02-27 43 Site Activity Status Update Received Download PDF file 2007 ANNUAL REPORT
2008-10-24 43 Site Activity Status Update Received 3RD QUARTER 2008 DMR
2008-09-02 43 Site Activity Status Update Received EW1 REPORT
2008-04-24 99 Miscellaneous Download PDF file DEED RESTRICTION
2008-04-18 43 Site Activity Status Update Received 2005-06 GW REPORT.
2007-09-26 99 Miscellaneous USEPA WITH WDNR CONCUR APPROVAL TO CLOSE EAST BANK SVE SYSTEM.
2007-08-31 99 Miscellaneous DEED RESTRICTION FOR WAUSAU CHEMICAL REC'D.
2007-04-26 99 Miscellaneous Download PDF file DEED RESTRICTION AT WAUSAU CHEMICAL RECORDED.
2006-12-05 99 Miscellaneous SITE VISIT & MEET EPA & MARATHON ELECTRIC.
2006-10-17 43 Site Activity Status Update Received Download PDF file CAP MAINTENANCE PLAN
2006-04-25 99 Miscellaneous EWI DISCHARGE REPORT
2006-04-25 43 Site Activity Status Update Received Download PDF file QUARTERLY REPORTS FROM 2006 THRU 2011
2006-04-13 99 Miscellaneous DRAFT DEED RESTRICTION & DEEDS FOR WAUSAU CHEMICAL PROPERTY REC'D
2006-02-06 43 Site Activity Status Update Received QUARTERLY GWE REPORT
2005-11-14 43 Site Activity Status Update Received EW 1 REPORT RECEIVED
2005-08-15 43 Site Activity Status Update Received ANNUAL MONITORING REPORT
2005-08-15 43 Site Activity Status Update Received Download PDF file 2004 ANNUAL REPORT
2005-06-30 326 Superfund Five Year Review Report Signed Download PDF file
2005-01-21 99 Miscellaneous 4TH QRT 2004 - EWI DISCHARGE REPORT
2004-11-01 99 Miscellaneous QRTLY RPT ON EW-1
2004-10-15 99 Miscellaneous Download PDF file DEED RESTRICTION CORRESPONDENCE
2004-07-16 99 Miscellaneous DISCHARGE MONITORING REPORT
2004-04-23 43 Site Activity Status Update Received 2003 GW MON RPT
2004-04-22 43 Site Activity Status Update Received 1ST QRT 2004 P&T RPT
2004-04-21 43 Site Activity Status Update Received Download PDF file 2003 ANNUAL REPORT
2003-10-15 43 Site Activity Status Update Received GW P & T STATUS
2003-08-15 99 Miscellaneous EW1 DISCHARGE RPT
2003-05-13 43 Site Activity Status Update Received Download PDF file 2002 ANNUAL REPORT
2003-02-07 99 Miscellaneous 02 4TH QRT. EW1 REPORT
2002-12-02 99 Miscellaneous AGENCY'S APPROVAL OF EAST SVE MONITORING PLAN
2002-12-02 99 Miscellaneous AGENCY'S LETTER RE WAUSAU CHEM P & T
2002-11-26 99 Miscellaneous DNR COMMENTS TO EPA
2002-11-15 99 Miscellaneous CRA PROPOSAL FOR GW MONITORING OF SVE SHUT OFF @ WCC
2002-11-04 43 Site Activity Status Update Received RPT ON EW-1
2002-11-04 99 Miscellaneous EW1 3RD QRT REPORT
2002-10-02 99 Miscellaneous MEETING AT SITE
2002-07-12 43 Site Activity Status Update Received PROGRESS REPORT ON EW1
2002-05-29 43 Site Activity Status Update Received Download PDF file 2001 ANNUAL REPORT
2002-04-17 99 Miscellaneous DNR REQUEST FOR GW REPORT
2002-04-12 43 Site Activity Status Update Received 1 Q. EW1 REPORT.
2002-03-11 99 Miscellaneous SOIL SAMPLE REPORT. REQUEST TO SHUT DOWN SVE.
2002-03-06 43 Site Activity Status Update Received 4 Q. EW1 REPORT.
2001-11-07 99 Miscellaneous SITE VISIT AT WAUSAU CHEM.
2001-04-18 43 Site Activity Status Update Received Download PDF file QUARTERLY REPORTS FROM 2001 THRU 2005
2001-03-14 43 Site Activity Status Update Received Download PDF file 2000 ANNUAL REPORT
2001-01-10 99 Miscellaneous REQUEST FOR SEASONAL SHUTDOWN OF SVE
2000-07-30 24 Long Term Monitoring Plan Received (non-Fee)
2000-07-10 326 Superfund Five Year Review Report Signed Download PDF file
2000-06-29 43 Site Activity Status Update Received Download PDF file GROUNDWATER MONITORING PLAN
2000-06-14 43 Site Activity Status Update Received MAY 2000
2000-05-10 43 Site Activity Status Update Received APRIL 2000
2000-04-26 99 Miscellaneous EPA COMMENTS ON GW MONITORING PLAN
2000-04-17 99 Miscellaneous Download PDF file CORRESPONDENCE FROM 2000 THRU 2014
2000-04-07 43 Site Activity Status Update Received MARCH 2000
2000-03-10 43 Site Activity Status Update Received FEBRUARY 2000
2000-01-11 99 Miscellaneous DECEMBER 1999 STATUS
1999-12-14 43 Site Activity Status Update Received NOVEMBER
1999-11-12 43 Site Activity Status Update Received OCTOBER
1999-08-31 99 Miscellaneous MWS WC6A, WC6, TCT44 AND E30 ABANDONED.
1999-08-11 43 Site Activity Status Update Received JULY
1999-04-12 43 Site Activity Status Update Received MONTHLY PROGRESS REPORT #96
1999-03-11 43 Site Activity Status Update Received MONTHLY STATUS REPORT #95
1999-02-12 43 Site Activity Status Update Received Download PDF file MONTHLY PROGRESS REPORTS FROM 1999 THRU JUNE 2000
1997-03-17 99 Miscellaneous DNR COMMENTS RE SVE CLOSURE. ADD'L WORK NEEDED.
1997-01-13 99 Miscellaneous Download PDF file DRAFT SOIL VAPOR SYSTEM CLOSURE REPORT
1996-08-20 326 Superfund Five Year Review Report Signed Download PDF file
1996-02-15 43 Site Activity Status Update Received Download PDF file SOIL VAPOR EXTRACTION SYSTEM PERFORMANCE EVALUATION REPORT MIDPOINT OF OPERATIONS
1996-02-15 43 Site Activity Status Update Received Download PDF file MONTHLY PROGRESS REPORT FROM 1996 THRU 1998
1995-08-25 27 Long Term Monitoring Plan Approved Download PDF file OPERATION AND MAINTENANCE PLAN FOR SOIL VAPOR EXTRACTION SYSTEM
1995-02-28 151 Remedial Action (RA) Documentation Report Received (non-fee) Download PDF file REMEDIAL DESIGN/REMEDIAL ACTION FINAL OVERSIGHT REPORT
1994-07-05 99 Miscellaneous Download PDF file SOIL VAPOR EXTRACTION SYSTEM CONSTRUCTION COMPLETION REPORT
1994-04-18 99 Miscellaneous Download PDF file MONITORING PROGRAM PLAN
1994-03-18 99 Miscellaneous Download PDF file PRELIMINARY CLOSEOUT REPORT
1994-03-16 99 Miscellaneous Download PDF file QUALITY ASSURANCE PROJECT PLAN REMEDIAL DESIGN/REMEDIAL ACTION AND ADDENDUM
1993-08-16 316 Superfund Site Assessment DNR Planning Documentation HEALTH AND SAFETY PLAN SOIL VAPOR EXTRACTION SYSTEM
1993-08-16 99 Miscellaneous Download PDF file CONSTRUCTION QUALITY ASSURANCE PROJECT PLAN SOIL VAPOR EXTRACTION SYSTEM
1993-07-02 99 Miscellaneous Download PDF file SOIL VAPOR EXTRACTION SYSTEM REMEDIAL DESIGN
1993-06-04 99 Miscellaneous Download PDF file SOIL VAPOR SYSTEM PREDESIGN INVESTIGATION REPORT
1993-05-28 43 Site Activity Status Update Received Download PDF file GROUNDWATER FLOW MODEL
1993-02-17 43 Site Activity Status Update Received Download PDF file 24-MONTH ASSESSMENT REPORT GROUNDWATER EXTRACTION, TREATMENT, AND DISCHARGE SYSTEM
1993-02-09 43 Site Activity Status Update Received Download PDF file MONTHLY PROGRESS REPORTS FROM 1993 THRU 1995
1993-01-11 99 Miscellaneous Download PDF file CORRESPONDENCE FROM 1993 THRU 1999
1992-07-01 99 Miscellaneous Download PDF file HEALTH ASSESSMENT
1992-05-08 43 Site Activity Status Update Received Download PDF file 12-MONTH ASSESSMENT REPORT GROUNDWATER EXTRACTION, TREATMENT, AND DISCHARGE SYSTEM
1992-01-09 43 Site Activity Status Update Received Download PDF file REMEDIAL DESIGN/REMEDIAL ACTION MONTHLY PROGRESS REPORTS FROM DECEMBER 1991 THRU AUGUST 1994
1992-01-01 211 Operation & Maintenance Start - State Lead
1991-10-16 99 Miscellaneous Download PDF file REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN
1991-09-12 99 Miscellaneous Download PDF file WORKPLAN FOR SOIL VAPOR EXTRACTION SYSTEM PREDESIGN STUDY
1991-07-09 43 Site Activity Status Update Received Download PDF file 6-MONTH ASSESSMENT REPORT GROUNDWATER EXTRACTION, TREATMENT, AND DISCHARGE SYSTEM
1991-03-18 99 Miscellaneous Download PDF file CONTINGENCY PLAN
1991-03-01 99 Miscellaneous Download PDF file REVISED COMMUNITY RELATIONS PLAN
1991-01-25 305 Superfund Enforcement Documents - See Description Download PDF file CONSENT DECREE
1991-01-16 99 Miscellaneous Download PDF file EVALUATION OF PUMPING RATE IN EXTRACTION WELL NO. 1
1990-12-21 316 Superfund Site Assessment DNR Planning Documentation Download PDF file LETTER OF AGREEMENT BETWEEN WDNR AND EPA
1990-12-18 43 Site Activity Status Update Received Download PDF file INTERIM ACTION MONTHLY PROGRESS REPORTS FROM NOVEMBER 1990 THRU NOVEMBER 1991
1990-12-13 92 Operation & Maintenance (O&M) Report Received (non-fee) OPERATION AND MAINTENANCE MANUAL FOR GROUNDWATER EXTRACTION, TREATMENT, AND DISCHARGE SYSTEM
1990-11-16 151 Remedial Action (RA) Documentation Report Received (non-fee) Download PDF file INTERIM REMEDIAL ACTION OVERSIGHT FINAL REPORT
1990-08-10 99 Miscellaneous Download PDF file QUALITY ASSURANCE PROJECT PLAN GROUNDWATER MONITORING PROGRAM
1990-08-10 43 Site Activity Status Update Received Download PDF file GROUNDWATER MONITORING PROGRAM EXTRACTION WELL AND MONITORING WELL NETWORK
1990-03-19 316 Superfund Site Assessment DNR Planning Documentation HEALTH & SAFETY PLAN INSTALLATION OF EXTRACTION WELL EW-1 & PUMPHOUSE AND DISCHARGE INSTALLATION
1990-03-19 151 Remedial Action (RA) Documentation Report Received (non-fee) Download PDF file REMEDIAL ACTION PLAN GROUNDWATER EXTRACTION, TREATMENT, AND DISCHARGE SYSTEM
1990-03-16 316 Superfund Site Assessment DNR Planning Documentation Download PDF file SPECIFICATIONS OF WORK PUMPHOUSE AND DISCHARGE OUTLET INSTALLATIONS EW-1
1990-03-01 99 Miscellaneous REMEDIAL DESIGN COMPLETE
1990-01-04 99 Miscellaneous Download PDF file CORRESPONDENCE FROM 1990 THRU 1992
1989-12-19 316 Superfund Site Assessment DNR Planning Documentation Download PDF file SPECIFICATIONS OF WORK INSTALLATION OF EXTRACTION WELL EW-1
1989-11-10 43 Site Activity Status Update Received Download PDF file MONTHLY PROGRESS REPORTS FROM OCTOBER 1989 THRU DECEMBER 1992
1989-09-29 314 Superfund Decision Document (ROD or ESD) - See Description Download PDF file RECORD OF DECISION-FINAL REMEDY
1989-09-20 99 Miscellaneous Download PDF file IN FIELD CONDITIONS REPORT
1989-09-08 305 Superfund Enforcement Documents - See Description Download PDF file CONSENT DECREE
1989-08-22 312 Superfund Proposed Plan Public Meeting Download PDF file PUBLIC MEETING TRANSCRIPT
1989-08-18 311 Superfund Proposed Plan (PP) Issued Download PDF file
1989-08-11 310 Superfund Final Feasibility Study (FS) Submittal DRAFT FINAL FEASIBILITY STUDY
1989-08-01 99 Miscellaneous Download PDF file FACT SHEET OF FEASIBILITY STUDY
1989-07-24 307 Superfund Final Remedial Investigation (RI) Approval Indicates multiple files are linked to this action
1989-06-01 99 Miscellaneous Download PDF file PRELIMINARY HEALTH ASSESSMENT
1989-05-03 99 Miscellaneous Download PDF file ALTERNATIVE ARRAY DOCUMENT
1988-12-23 314 Superfund Decision Document (ROD or ESD) - See Description Download PDF file INTERIM ROD
1988-10-17 312 Superfund Proposed Plan Public Meeting Download PDF file PUBLIC MEETING TRANSCRIPT
1988-09-30 311 Superfund Proposed Plan (PP) Issued Download PDF file
1988-09-14 310 Superfund Final Feasibility Study (FS) Submittal PUBLIC COMMENT DRAFT OF PHASED FEASIBILITY STUDY
1988-07-11 99 Miscellaneous Download PDF file REQUEST FOR APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS
1988-06-24 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file RIFS WORK PLAN PHASE II
1988-06-24 99 Miscellaneous Download PDF file RI/FS QUALITY ASSURANCE PROJECT PLAN ADDENDUM
1988-04-25 99 Miscellaneous Download PDF file PHASE 1 REMEDIAL INVESTIGATION TECHNICAL MEMORANDUM
1988-03-28 99 Miscellaneous Download PDF file ON-SCENE COORDINATOR'S REPORT
1988-03-04 316 Superfund Site Assessment DNR Planning Documentation Download PDF file SCOPE OF WORK FOR INSTALLATION OF AN INTERCEPTOR/EXTRACTION WELL & CONSTRUCTION OF WATER MAIN
1987-12-08 99 Miscellaneous Download PDF file CIVIL LITIGATION REFERRAL
1987-11-16 99 Miscellaneous Download PDF file COMMUNITY RELATIONS PLAN
1987-09-22 99 Miscellaneous Download PDF file QUALITY ASSURANCE PROJECT PLAN RI/FS
1987-09-21 99 Miscellaneous Download PDF file PLAN OF REMEDIAL WORK -- MARATHON ELECTRIC
1987-09-10 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file
1987-09-01 316 Superfund Site Assessment DNR Planning Documentation HEALTH AND SAFETY PLAN
1987-06-18 43 Site Activity Status Update Received Download PDF file HYDROGEOLOGICAL INVESTIGATION OF ALLUVIAL AQUIFER
1987-05-14 43 Site Activity Status Update Received Download PDF file GROUNDWATER EXTRACTION PROGRAM MONITORING DATA FROM APRIL 1987 THRU JULY 1994
1987-01-26 43 Site Activity Status Update Received Download PDF file GROUNDWATER EXTRACTION PROGRAM REPORT
1987-01-15 43 Site Activity Status Update Received Download PDF file VOLATILE ORGANIC COMPOUND GROUNDWATER INVESTIGATION
1987-01-15 99 Miscellaneous Download PDF file CORRESPONDENCE FROM 1987 THRU 1989
1986-10-03 43 Site Activity Status Update Received Download PDF file GROUNDWATER EXTRACTION PROGRAM INTERIM REPORT
1986-08-25 99 Miscellaneous Download PDF file EXISTING CONDITIONS AND EXPLORATION PROGRAM REPORT
1986-07-14 99 Miscellaneous Download PDF file EXISTING CONDITIONS -- VOLATILE ORGANIC COMPOUND CONTAMINATION REPORT
1986-06-10 301 Superfund NPL, NPL Proposed or Alternative Approach Site 301 DATE BASED ON FINAL NPL LISTING DATE
1986-06-01 99 Miscellaneous Download PDF file AERIAL PHOTO ANALYSIS
1986-05-19 99 Miscellaneous RESPONSIBLE PARTY SEARCH REPORT
1986-02-14 99 Miscellaneous Download PDF file INVESTIGATION OF AN ABANDONED CITY OF WAUSAU LANDFILL
1986-02-12 43 Site Activity Status Update Received Download PDF file HYDROGEOLOGICAL INVESTIGATION OF VOLATILE ORGANIC COMPOUNDS
1985-12-18 43 Site Activity Status Update Received Download PDF file GROUNDWATER EXTRACTION PROGRAM INTERIM REPORT
1985-08-13 350 Superfund Site Assessment Preliminary Assessment (PA) Download PDF file PRELIMINARY ASSESSMENT -- MARATHON ELECTRIC
1985-04-03 99 Miscellaneous Download PDF file SUBSURFACE EXPLORATION & TESTING PROGRAM TO EVALUATE GROUNDWATER QUALITY AND PRE-TREATMENT DESIGN
1985-01-09 319 Superfund Site Assessment HRS Scoring Package Download PDF file
1985-01-07 99 Miscellaneous Download PDF file CORRESPONDENCE FROM 1985 THRU 1986
1984-12-27 99 Miscellaneous Download PDF file CORRESPONDENCE FROM 1939 THRU 1984
1984-09-19 99 Miscellaneous Download PDF file WELL CONSTRUCTION REPORTS FROM SEPTEMBER 1984 THRU NOVEMBER 1984
1984-08-07 350 Superfund Site Assessment Preliminary Assessment (PA) Download PDF file PRELIMINARY ASSESSMENT -- CITY OF WAUSAU WATER SUPPLY
1984-07-31 99 Miscellaneous Download PDF file PRELIMINARY STUDY REPORT
1984-05-03 351 Superfund Site Assessment Site Inspection (SI) Download PDF file SITE ASSESSMENT AND RECOMMENDED IMMEDIATE ACTIONS
1984-03-30 43 Site Activity Status Update Received Download PDF file GROUNDWATER MONITORING INVENTORY FORMS FROM 1984 THRU 1988
1983-02-15 1 Notification of Hazardous Substance Discharge
Substances
Substance Type Amt Released Units
Chlorinated Solvents VOC
Chlorinated Solvents VOC
Tetrachloroethene (Perchloroethylene) VOC
Trichloroethylene Industrial Chem
Volatile Organic Compounds VOC
Responsible Party
CITY OF WAUSAU 407 GRANT ST, WAUSAU, WI 54403
DNR Project Manager
JANE GRAY  jane.gray@wisconsin.gov
32782 | 02-37-000017
BOTW Release 4.3 | 4/16/2025 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages