02-16-563449
HOWARDS BAY SEDIMENTS
|
Activity Type / Status | Jurisdiction |
---|---|
ERP / OPEN | DNR RR |
Location Name | County | DNR Region |
---|---|---|
HOWARDS BAY SEDIMENTS | DOUGLAS | NORTHERN |
Address | Municipality |
---|---|
HOWARDS BAY / ST LOUIS RIVER | SUPERIOR |
PLSS Description | Latitude (WGS84) | Longitude (WGS84) | Google Maps | RR Sites Map |
---|---|---|---|---|
NW 1/4 of the SW 1/4 of Sec 11, T49N, R14W | 46.7393248 | -92.0929197 |
![]() |
![]() |
Additional Activity Details | Acres |
---|---|
UNKNOWN |
Facility ID | PECFA No. | EPA ID | Start Date | End Date |
---|---|---|---|---|
1993-05-07 |
Above Ground Petrol Tank |
Drycleaner |
EPA NPL Site |
EPA Superfund |
PECFA Funds Eligible |
PFAS |
ROW Impact |
Sediments |
Underground Petrol Tank |
WI DOT Site |
---|---|---|---|---|---|---|---|---|---|
![]() |
Date | Code | Name | File | Comment | |
---|---|---|---|---|---|
2025-01-27 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2024 - 12/31/2024 | |
2024-07-30 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2024 - 6/30/2024 | |
2024-01-27 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2023 - 12/31/2023 | |
2023-12-20 | 99 | Miscellaneous |
![]() |
EMAIL TRANSMITTAL OF CONSTRUCTION DOC RPT | |
2023-12-18 | 151 | Remedial Action (RA) Documentation Report Received (non-fee) |
![]() |
CONSTRUCTION DOC RPT - 1 OF 2 TEXT & FIGURES; 2 OF 2 APPENDICES | |
2023-07-26 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 01/01/2023 - 06/30/2023 | |
2023-01-24 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2022 - 12/31/2022 | |
2022-07-22 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2022 - 6/30/2022 | |
2022-03-08 | 147 | Remedial Action (RA) Design Report Received (non-fee) |
![]() |
DESIGN DOC RPT UPDATED TO REFLECT CHANGES DURING CONSTRUCTION | |
2022-01-11 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2021 - 12/31/2021 | |
2021-07-28 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2021 - 6/30/2021 | |
2021-01-29 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2020 - 12/31/2020 | |
2020-08-26 | 147 | Remedial Action (RA) Design Report Received (non-fee) | DESIGN PLANS FOR RA - AS AWARDED | ||
2020-08-17 | 99 | Miscellaneous |
![]() |
8/17/20 DNR REG REMIND LTR NOT SENT - GREAT LAKES LEGACY ACT PROJECT | |
2020-08-13 | 147 | Remedial Action (RA) Design Report Received (non-fee) |
![]() |
SPECIFICATIONS FOR RA - AS AWARDED | |
2020-07-28 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2020 - 6/30/2020 | |
2020-01-27 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2019 - 12/31/2019 | |
2020-01-24 | 147 | Remedial Action (RA) Design Report Received (non-fee) |
![]() |
DESIGN DOC RPT DDR - 1 OF 2 | |
2020-01-24 | 99 | Miscellaneous |
![]() |
CHAPTER 30 PERMIT FOR REMEDIAL CONSTRUCTION | |
2019-07-10 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2019 - 6/30/2019 | |
2019-03-26 | 99 | Miscellaneous |
![]() |
GLLA PROJECT AGREEMENT SIGNED | |
2019-03-26 | 99 | Miscellaneous |
![]() |
GLLA PROJECT AGREEMENT SIGNED - SIGNATURE PAGE 20 | |
2019-01-30 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2018 - 12/31/2018 | |
2018-07-31 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2018 - 6/30/2018 | |
2018-01-30 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2017 - 12/31/2017 | |
2017-08-08 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2017 - 6/30/2017 | |
2017-01-24 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2016 - 12/31/2016 | |
2017-01-24 | 99 | Miscellaneous | PUBLIC MEETING W/ CITY OF SUPERIOR | ||
2017-01-10 | 99 | Miscellaneous | WI POINT COMMITTEE PRESENTATION | ||
2016-12-19 | 99 | Miscellaneous | MEETING W/FRASER, EPA, USACE & DNR RE: 65% DDR COMMENTS | ||
2016-11-17 | 147 | Remedial Action (RA) Design Report Received (non-fee) | 65% DRAFT DESIGN RPT (DDR) REC'D | ||
2016-11-17 | 99 | Miscellaneous | 65% DDR FIGURE 3 | ||
2016-11-17 | 99 | Miscellaneous | 65% DDR FIGURE 4 | ||
2016-11-17 | 99 | Miscellaneous | 65% DDR TABLE 3 | ||
2016-11-17 | 99 | Miscellaneous | 65% DDR TABLE 4 | ||
2016-11-17 | 99 | Miscellaneous | 65% DDR APENDIX B - WI POINT LF PLACEMENT CRITERIA | ||
2016-10-25 | 99 | Miscellaneous | GLLA PRESENTATION TO GLNPO TRC | ||
2015-10-30 | 99 | Miscellaneous | DRAFT SOURCE EVALUATION RPT REC'D | ||
2015-10-30 | 99 | Miscellaneous |
![]() |
DNR SOURCE EVALUATION | |
2015-10-09 | 99 | Miscellaneous | REFER TO 02-16-120591 FRASER SHIPYARDS AOC #14 SITE FOR STATUS | ||
2015-09-24 | 99 | Miscellaneous | DNR PROVIDED COMMENTS ON DRAFT FFS | ||
2015-07-22 | 39 | Remedial Action Options Report (RAOR) Received (non-fee) |
![]() |
FOCUSED FEASABILITY STUDY RPT REC'D | |
2014-11-20 | 99 | Miscellaneous | MEETING W/FRASER, EPA & USACE TO DISCUSS FFS REMEDY SELECTION | ||
2014-10-31 | 99 | Miscellaneous | MEETING W/FRASER & CONSULTANT TO DISCUSS BAXTER AVE REQUIREMENTS | ||
2014-09-05 | 99 | Miscellaneous | CONSULTANT PREPARED DRAFT FFS FOR REVIEW | ||
2014-09-03 | 99 | Miscellaneous | FFS MEETING AT FRASER | ||
2014-09-02 | 99 | Miscellaneous |
![]() |
REC'D CHS RESPONSE TO PRP LETTER | |
2014-08-19 | 99 | Miscellaneous | DATA SUMMARY RPT (TEXT) REC'D | ||
2014-08-19 | 99 | Miscellaneous | DATA SUMMARY RPT (FIGURES) REC'D | ||
2014-08-19 | 99 | Miscellaneous | DATA SUMMARY RPT (TABLES) REC'D | ||
2014-08-19 | 99 | Miscellaneous | FINAL DATA SUMMARY RPT REC'D | ||
2014-08-18 | 99 | Miscellaneous | ADDT'L SEDIMENT SAMPLING OF HOWARDS BAY | ||
2014-08-15 | 20 | Potential Responsible Party (PRP) Letter Sent |
![]() |
6 PRP LETTERS SENT FOR CONTAMINATION IN HUGHITT & CUMMINGS SLIPS | |
2014-08-13 | 99 | Miscellaneous | FFS MEETING AT FRASER | ||
2014-08-07 | 99 | Miscellaneous | MEETING W/FRASER'S CONSULTANT TO DEFINE REMEDIAL AREAS | ||
2014-05-19 | 99 | Miscellaneous | FINAL SIGNED PROJECT AGREEMENT FOR FFS/RD | ||
2014-01-22 | 99 | Miscellaneous | CONF CALL W/EPA TO DISCUSS FFS PROJECT AGREEMENT & SOW | ||
2013-12-09 | 99 | Miscellaneous | GLLA APPLICATION SUBMITTED TO EPA - FFS/RD | ||
2013-09-09 | 99 | Miscellaneous | ADDT'L SEDIMENT SAMPLING CONDUCTED W/FRASER, EPA, USACE | ||
2013-07-31 | 99 | Miscellaneous | MTG W/FRASER, CONSULTANT, EPA & DNR TO DISCUSS SEDIMENT CLEANUP | ||
2013-06-06 | 99 | Miscellaneous | MEETING & SITE VISIT AT FRASER SHIPYARD | ||
2013-02-25 | 99 | Miscellaneous | CONF CALL W/GLNPO && USACE RE: DREDGING, SED REMOVAL IN HOWARDS BAY | ||
2012-12-07 | 99 | Miscellaneous | CONF CALL RE: USE OF DREDGE MATERIAL TO FILL BAXTER AVE SLIP | ||
2012-09-20 | 99 | Miscellaneous | FINAL SEDIMENT ASSESSMENT RPT REC'D | ||
2011-10-07 | 99 | Miscellaneous | DRAFT SEDIMENT ASSESSMENT RPT REC'D | ||
2010-10-16 | 99 | Miscellaneous | GLLA-FUNDED SEDIMENT SAMPLING OF HOWARDS BAY | ||
2003-09-18 | 355 | Superfund No Further Remedial Action Planned (NFRAP) | FROM SUPERFUND DATABASE: NFRAP APPROVED BY EPA | ||
2003-09-17 | 352 | Superfund Preliminary Assessment/Site Inspection | WDNR PA/SI SUBMITTED TO EPA REGION 5 | ||
1993-05-07 | 1 | Notification of Hazardous Substance Discharge | |||
1993-05-07 | 99 | Miscellaneous | VARIOUS SEDIMENT SAMPLING EVENTS CONDUCTED 1993 - 2014 |
Substance | Type | Amt Released | Units |
---|---|---|---|
Lead (Pb) | Metals | ||
Mercury | Metals | ||
Other Substance Not Listed | Other | ||
Polynuclear Aromatic Hydrocarbons | Petroleum |
UNKNOWN , , |