2024-08-19
43
Site Activity Status Update Received
JULY 2024 MULTIPORT GROUNDWATER DATA
2024-08-09
43
Site Activity Status Update Received
Q2 2024 GROUNDWATER RESULTS - MONITORING WELLS ONLY
2024-07-17
99
Miscellaneous
2024 ANNUAL COVER SYSTEM MAINTENANCE INSPECTION REPORT
2024-07-12
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2024 - 6/30/2024
+
2024-04-24
43
Site Activity Status Update Received
Q1 2024 GROUNDWATER RESULTS
20240424_43_GW_Results_Q1_2024_1_of_2.pdf
20240424_43_GW_Results_Q1_2024_2_of_2.pdf
+
2024-03-22
43
Site Activity Status Update Received
STORMWATER RESULTS
20240322_43_StW_Results_1_of_2.pdf
20240322_43_StW_Results_2_of_2.pdf
2024-03-06
99
Miscellaneous
2023 ANNUAL COVER SYSTEM MAINTENANCE INSPECTION REPORT
2024-01-23
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2023 - 12/31/2023
+
2023-12-22
43
Site Activity Status Update Received
Q4 2023 GROUNDWATER RESULTS
20231222_43_GW_Results_Q4_1_of_2.pdf
20231222_43_GW_Results_Q4_2_of_2.pdf
+
2023-10-16
43
Site Activity Status Update Received
Q3 2023 GROUNDWATER RESULTS
20231016_43_GW_Results_Q3_1_of_2.pdf
20231016_43_GW_Results_Q3_2_of_2.pdf
2023-10-16
43
Site Activity Status Update Received
STORMWATER RETENTION BASIN SOIL RESULTS
+
2023-08-03
43
Site Activity Status Update Received
Q2 2023 GROUNDWATER RESULTS 1 OF 2
20230803_43_GW_Results_Q2.pdf
20230803_43_GW_Results_Q2_Lab_Data.pdf
2023-07-25
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 01/01/2023 - 06/30/2023
2023-04-21
43
Site Activity Status Update Received
SURFACE WATER RESULTS FOR STORMWATER RETENTION BASIN - SAMPLE COLLECTED ON 4/4/23
2023-04-21
43
Site Activity Status Update Received
SURFACE WATER RESULTS FOR STORMWATER RETENTION BASIN - SAMPLE COLLECTED ON 4/5/23
2023-03-23
36
Site Investigation Workplan (SIWP) Approved
2023-03-21
135
Site Investigation Workplan (SIWP) Received (fee)
SUPPLEMENTAL SIWP ADDENDUM
2023-03-10
99
Miscellaneous
CAP MAINTENENCE PLAN
2023-02-23
99
Miscellaneous
ACCCESS AGREEMENT DOC MEMO
2023-01-23
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2022 - 12/31/2022
2023-01-22
153
Remedial Action (RA) Documentation Report Approved
ADDITIONAL SOIL SAMPLING REQUESTED
2023-01-20
98
Technical Assistance Provided
NOTES FROM TECH ASSIST MEETING 12/9/2022
+
2023-01-06
28
Phase I Environmental Site Assessment (ESA) Rpt Received
20230106_28_Phase_I.pdf
20230106_28_Phase_I_Addendum.pdf
2022-12-12
43
Site Activity Status Update Received
STATUS REPORT REC
2022-12-09
99
Miscellaneous
TECH ASSIST MEETING WITH TRC AND ROCKGEN
2022-12-01
97
Technical Assistance Request Received (fee)
TECH ASSIST MEETING ON 12/9/2022
2022-10-07
152
Remedial Action Documentation Report Received (fee)
2022-09-12
43
Site Activity Status Update Received
ANALYTICAL REPORT
2022-07-20
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2022 - 6/30/2022
2022-05-26
43
Site Activity Status Update Received
ANALYTICAL REPORT
2022-04-11
38
Site Investigation Report (SIR) Approved
2022-03-02
43
Site Activity Status Update Received
STATUS REPORT
2022-01-27
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2021 - 12/31/2021
2022-01-05
43
Site Activity Status Update Received
ANALYTICAL REPORT
2021-09-24
137
Site Investigation Report (SIR) Received (fee)
2021-08-13
43
Site Activity Status Update Received
ANALYTICAL RESULTS
2021-08-13
36
Site Investigation Workplan (SIWP) Approved
2021-08-06
43
Site Activity Status Update Received
SUPPLEMENTAL SITE INVESTIGATION WORKPLAN
2021-08-06
35
Site Investigation Workplan (SIWP) Received (non-fee)
2021-07-30
43
Site Activity Status Update Received
ANALYTICALS
2021-07-30
149
Remedial Action (RA) Design Report Approved
2021-07-30
99
Miscellaneous
PRIVATE WELL TESTING RESULTS
2021-07-26
148
Remedial Action Design Report Received (fee)
2021-07-26
43
Site Activity Status Update Received
INTERIM ACTION WORKPLAN
2021-07-23
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2021 - 6/30/2021
2021-07-16
43
Site Activity Status Update Received
ANALYTICAL REPORT
2021-07-16
43
Site Activity Status Update Received
ANALYTICAL REPORT
2021-05-28
43
Site Activity Status Update Received
ANALYTICAL RESUTS
2021-05-28
43
Site Activity Status Update Received
ANALYTICAL RESULTS
2021-05-28
43
Site Activity Status Update Received
ANALYTICAL RESULTS
2021-05-07
43
Site Activity Status Update Received
ANALYTICAL REPORT
2021-05-07
43
Site Activity Status Update Received
ANALYTICAL REPORT
2021-05-07
43
Site Activity Status Update Received
ANALYTICAL REPORT
2021-04-09
36
Site Investigation Workplan (SIWP) Approved
2021-04-09
116
PFAS Sampling Required
2021-04-06
135
Site Investigation Workplan (SIWP) Received (fee)
2021-04-06
114
PFAS Scoping Statement Received
2021-03-23
2
Responsible Party (RP) letter sent
2021-03-19
1
Notification of Hazardous Substance Discharge
2021-03-19
43
Site Activity Status Update Received
LAB RESULTS
2021-03-19
120
PFAS Sampling Completed - Actionable Levels Detected