2024-03-14
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
PROPOSE INSTALLING 3 ADDITIONAL MONITORING WELLS FOR DELINEATION TO THE WEST
|
|
2024-02-20
|
43
|
Site Activity Status Update Received
|
|
INSTALLED 3 ADDITIONAL MWS AND SAMPLED MW NETWORK; PLANNING TO INSTALL ADDITIONAL MWS
|
|
2024-01-03
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2023 - 12/31/2023
|
|
2023-09-20
|
99
|
Miscellaneous
|
|
DNR REQUESTS SEMI-ANNUAL GROUNDWATER MONITORING
|
|
2023-09-05
|
43
|
Site Activity Status Update Received
|
|
JULY 2023 GROUNDWATER MONITORING RESULTS
|
|
2023-08-28
|
43
|
Site Activity Status Update Received
|
|
GW MONITORING RESULTS SENT TO OFF-SITE PROPERTY OWNER
|
|
2023-07-07
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 01/01/2023 - 06/30/2023
|
|
2023-05-17
|
7
|
Environmental Consultant Hired
|
|
CAROW LAND SURVEYING AND ENVIRONMENTAL
|
|
2023-04-03
|
43
|
Site Activity Status Update Received
|
|
STATUS REPORT CONTAINING ALL SOIL AND GROUNDWATER PFAS SAMPLING RESULTS TO DATE
|
|
2023-01-12
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2022 - 12/31/2022
|
|
2022-09-14
|
43
|
Site Activity Status Update Received
|
|
GROUNDWATER SAMPLING RESULTS FROM EXISTING AND NEW WELLS AND PIEZOMETERS INSTALLED ON & OFF-SITE
|
|
2022-07-25
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2022 - 6/30/2022
|
|
2022-05-12
|
43
|
Site Activity Status Update Received
|
|
PFAS SOIL BORINGS/WELLS AND GROUNDWATER SAMPLING IS CURRENTLY SCHEDULED FOR JULY 11TH TO THE 13TH
|
|
2022-01-06
|
99
|
Miscellaneous
|
|
DNR RESPONSE TO OFF-SITE ATTORNEY; OFF-SITE SAMPLING REQUIRED TO DEFINE DEGREE & EXTENT
|
|
2022-01-04
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2021 - 12/31/2021
|
|
2021-09-27
|
30
|
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
|
|
ATTACHED TO AC 35 DATED 9/16/2021
|
|
2021-09-16
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
UPDATED WORKPLAN TO INSTALL PIEZOMETER & COLLECT SOIL SAMPLES FROM MONITORING WELL LOCATIONS
|
|
2021-09-13
|
43
|
Site Activity Status Update Received
|
|
UPDATE WITH MONITORING WELL INSTALLATION, GROUNDWATER SAMPLING & SOIL SAMPLING RESULTS FOR PFAS
|
|
2021-09-13
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
SEE AC 43 OF SAME DATE; INSTALL ADDITIONAL MONITORING WELLS & RESAMPLE GROUNDWATER
|
|
2021-07-07
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2021 - 6/30/2021
|
|
2021-07-01
|
99
|
Miscellaneous
|
|
(MW1, MW2, MW3) WERE TRANSFERRED FROM THE SOLBERG CO (03-05-584180)
|
|
2021-04-22
|
30
|
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
|
|
SEE AC 35 DATED 4/5/2021 FOR DOCUMENTATION
|
|
2021-04-21
|
2
|
Responsible Party (RP) letter sent
|
|
|
|
2021-04-05
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
SIWP FOR ADDITIONAL MW & PZ INSTALLATION, GW SAMPLING & SHALLOW SOIL SAMPLING
|
|
2021-03-03
|
1
|
Notification of Hazardous Substance Discharge
|
|
|
|
2021-03-03
|
120
|
PFAS Sampling Completed - Actionable Levels Detected
|
|
SEE AC 1 OF SAME DATE FOR DOCUMENTATION
|
|
2020-09-09
|
116
|
PFAS Sampling Required
|
|
|
|
2020-08-27
|
114
|
PFAS Scoping Statement Received
|
|
SAFETY DATA SHEETS FOR AFFF (FOAM) TESTED AT FACILITY
|