ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on
the Web
ACTIVITY DETAILS
02-28-588371
LOEB-LORMAN SCRAPYARD FORMER
|
Activity Type / Status |
Jurisdiction |
ERP
/
OPEN
|
DNR RR |
Address |
Municipality |
115 LORMAN ST |
FORT ATKINSON |
PLSS Description |
Latitude (WGS84) |
Longitude (WGS84) |
Google Maps |
RR Sites Map |
SW 1/4 of the SW 1/4 of Sec 34, T06N, R14E
|
42.9367527 |
-88.8343037 |
|
|
Additional Location Description |
600 OAK ST AND 205 HAKE ST
|
Additional Activity Details |
Acres |
|
UNKNOWN
|
Facility ID |
PECFA No. |
EPA ID |
Start Date |
End Date |
128089720
|
|
|
2021-09-02
|
|
Characteristics
Above Ground Petrol Tank
|
Drycleaner |
EPA NPL Site
|
EPA Superfund
|
PECFA Funds Eligible
|
PFAS |
ROW Impact |
Sediments |
Underground Petrol Tank
|
WI DOT Site
|
|
|
|
|
|
|
|
|
|
|
Actions and Documents
Records related to the site are
documents that were available at the time the scanned paper or
electronic file was uploaded. Records withheld by the
department due to confidentiality, attorney-client privilege,
and other sensitive records, as well as lab data, may not be
included. Additional records associated with the site may or
may not be accessible through an open records request through
DNR or another state agency (see Jurisdiction above).
|
|
Date |
Code |
Name |
File |
Comment |
|
2024-01-02
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2023 - 12/31/2023
|
|
2023-07-12
|
137
|
Site Investigation Report (SIR) Received (fee)
|
|
|
|
2023-06-30
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 01/01/2023 - 06/30/2023
|
|
2023-05-11
|
99
|
Miscellaneous
|
|
PROJECT STATUS AND SCHEDULE FOR NEXT STEPS LETTER FROM DNR
|
|
2023-03-24
|
126
|
Interim Action Report Received (non-fee)
|
|
PCBS > 50 PPM
|
|
2023-01-20
|
43
|
Site Activity Status Update Received
|
|
PCB SOIL SAMPLE RESULTS
|
|
2023-01-03
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2022 - 12/31/2022
|
|
2022-09-29
|
140
|
Site Investigation Report (SIR) Not Approved
|
|
|
|
2022-07-25
|
137
|
Site Investigation Report (SIR) Received (fee)
|
|
|
|
2022-07-19
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2022 - 6/30/2022
|
|
2022-01-17
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2021 - 12/31/2021
|
|
2021-12-07
|
81
|
Site Investigation Workplan (SIWP) Not Approved
|
|
|
|
2021-11-08
|
43
|
Site Activity Status Update Received
|
|
SIWP REVISED
|
|
2021-11-08
|
199
|
Additional Information Received (Fee-Based or Closure)
|
|
|
|
2021-10-15
|
99
|
Miscellaneous
|
|
INITIAL COMMENTS ON WORKPLAN
|
|
2021-10-15
|
198
|
Request for Additional Information (Fee-Based or Closure)
|
|
NEED WP REVISIONS
|
|
2021-09-29
|
28
|
Phase I Environmental Site Assessment (ESA) Rpt Received
|
|
|
|
2021-09-29
|
29
|
Phase II Environmental Site Assessment (ESA) Rpt Received
|
|
AUTOPOPULATED FROM 28 ENTRY
|
|
2021-09-29
|
135
|
Site Investigation Workplan (SIWP) Received (fee)
|
|
|
|
2021-09-17
|
2
|
Responsible Party (RP) letter sent
|
|
|
|
2021-09-02
|
1
|
Notification of Hazardous Substance Discharge
|
|
|
Relationships to Other Activities
Click Activity Below to View
Details
Substances
Substance |
Type |
Amt Released |
Units |
Arsenic |
Metals |
|
|
Lead (Pb) |
Metals |
|
|
Polychlorinated Biphenyl |
PCB |
|
|
Polynuclear Aromatic Hydrocarbons |
Petroleum |
|
|
Tetrachloroethene (Perchloroethylene) |
VOC |
|
|
Trichloroethylene |
Industrial Chem |
|
|
Volatile Organic Compounds |
VOC |
|
|
Responsible Party
ANDY SELLE 101 N MAIN ST, FORT ATKINSON, WI 53538 |
CITY OF FORT ATKINSON 101 N MAIN ST, FORT ATKINSON, WI 53538 |
DNR Project Manager
588371
|
02-28-588371