Reporting Period: | 1/1/2017 - 6/30/2017 |
BRRTS No: | 02-31-564071 |
Activity Name: | ALLYN PROPERTY |
Status: | Site Investigation |
Activity: | Field Sampling/Monitoring |
Comments: | A vapor mitigation system was installed on June 22, 2017, at the site, and is operating. A-1 Vacuum & Radon is preparing the installation and communication testing report. |
Submitted by Don Brittnacher on 07/26/2017 |