Comments: |
Remedial action design activities were initiated during the reporting period. Baseline groundwater, concrete, and treatability samples were collected (November 2017) and a bench scale treatability testing was performed(November â December 2017). Groundwater and concrete sample analytical results were submitted to WDNR via e-mail on December 13, 2017 and preliminary treatability results were shared on January 4, 2018. The results of these pre-design sampling activities will be formally documented in the remedial design report that is currently being prepared.
|