Reporting Period: | 7/1/2017 - 12/31/2017 |
BRRTS No: | 02-59-000198 |
Activity Name: | ANIWA ARSENIC SITE |
Status: | Site Investigation |
Activity: | Field Sampling/Monitoring |
Comments: | Report was previously submitted for the period 1/1/2017-6/30/2017 including lab results for selected monitoring wells and drinking water well west of the site (TIMM well) to Tauren Beggs. Additional sampling was done for the period 7/1/2017-12/30/2017 for monitoring wells and TIMM Well although not required. Will send those results to Tauren Beggs. Done in addition to pinpoint the cleanup process. |
Submitted by Warren A. Hohn on 02/01/2018 |