Comments: |
Site investigation activities are ongoing.
An Draft Interim Soil and Groundwater/Surface Water Data Summary was submitted to WDNR on March 2, 2018 followed by a finalized submittal dated April 26, 2018 incorporating comments from a meeting with WDNR on March 29, 2018.
Additional well installations have been subsequently completed and the next round of groundwater sampling is scheduled for July 2018. Additional soil vapor intrusion study work has also been performed including obtaining access agreements and indoor air/sub-slab vapor sampling.
|