Reporting Period: | 7/1/2018 - 12/31/2018 |
BRRTS No: | 02-08-520157 |
Activity Name: | MIRRO PLT #20 (FORMER) |
Status: | Site Investigation |
Activity: | Field Sampling/Monitoring |
Comments: | A select round of groundwater samples was collected and analyzed from the site in August 2018 for potential PFOA/PFOS impacts. This sampling was performed as recommended by WDNR based on potential past activities at the site. Results of the sampling and analysis have been provided to WDNR. A site closure package is currently being prepared, including the new groundwater data. |
Submitted by John E. Guhl on 01/03/2019 |