Comments: |
One round of monitoring well sampling and a groundwater sampling event were conducted during this reporting period. The monitoring well sampling event consisted of sampling all active monitoring wells while simultaneously collecting discrete groundwater samples near existing monitoring wells and in locations that need further plume definition. A Site Status Report dated February 8, 2019 was submitted to the WDNR detailing previous well installation, sub-slab sampling, monitoring well sampling activities. An analysis of the existing plume from sampling results is expected during this reporting period.
|