Soil excavation and site restoration activities associated with site redevelopment were completed during the reporting period. Post construction site investigation activities were initiated in March 2019 with the installation of three groundwater monitoring wells. Groundwater samples were collected from the site monitoring wells in March and June of 2019. The soil excavation/NR 718 soil relocation activities will be documented in a Construction Documentation Report that is currently being prepared. The post construction site investigation activities will be documented in an NR 716 Site Investigation Report.
|