A semi-annual report summarizing the remediation activities between January and June 2019 will be submitted in August 2019. (Included with the Madison Kipp Corp BRRTS Site 02-13-558625 summary report). An annual report summarizing the 2018 remediation activities was submitted in March 2019. Reports include site groundwater monitoring and system operations details.
A Soil Vapor Extraction Shut Down & Monitoring Well Network Modification Work Plan was submitted on August 22, 2018. The SVE system was temporarily shut down in October 2018 and confirmation sampling is being completed, an update letter was submitted to the WDNR in February 2019 and additional sampling will be conducted during the next reporting period.
|