Reporting Period: | 7/1/2019 - 12/31/2019 |
BRRTS No: | 02-41-580746 |
Activity Name: | AHPRC |
Status: | Remediation |
Activity: | Sampling/Monitoring |
Comments: | Post-construction groundwater monitoring was conducted in September and December 2019. The results will be incorporated into the Construction Documentation/Post-Construction Monitoring Report that is currently being prepared. |
Submitted by Susan Petrofske on 01/23/2020 |