Comments: |
Submitted Site Investigation Work Plan in February for vapor and groundwater sampling.
Collected nine indoor air and nine sub-slab vapor samples for VOCs, and collected ten sub-slab pressure readings and nine indoor air pressure readings in February. Collect site-wide water levels and sample groundwater from 4 wells. Status report was submitted with the data.
Collected 12 indoor air and six sub-slab vapor samples for VOCs, and collected ten sub-slab pressure readings and nine indoor air pressure readings in March. Collect site-wide water levels and sample groundwater from 4 wells. Status report was submitted.
Collected 14 indoor air and 10 sub-slab vapor samples for VOCs, and collected ten sub-slab pressure readings and nine indoor air pressure readings in June.Collect site-wide water levels and sample groundwater from 4 wells.
|