Comments: |
An annual report for groundwater monitoring was submitted to WDNR on June 9, 2014. A response to WDNR comments for that report was submitted on September 5, 2014. The SVE system continued to operate through December 2014, and quarterly groundwater samples were collected in June, September, and December 2014. Two off-site wells were also installed in November 2014. Following collection of additional groundwater samples in March 2015 an annual report will be prepared to summarize results of samples collected since submittal of the last annual report.
|