Reporting Period: | 7/1/2022 - 12/31/2022 |
BRRTS No: | 02-41-580746 |
Activity Name: | AHPRC |
Status: | Remediation |
Activity: | RAOR Report Preparation |
Comments: | As part of preliminary design planning considerations associated with potential expansion of the AHPRC building, pre-construction waste characterization samples were collected in August 2022. These waste characterization analytical results and potential future construction plans are being reviewed relative to the in-progress draft Site Investigation/Remedial Action Options Report to determine appropriate timing for submittal. |
Submitted by Susan Petrofske on 01/17/2023 |