Comments: |
Site Status
A Site Investigation (SI) Work Plan was submitted on October 4, 2022, with clarifications requested by WDNR on December 5, 2022, and an addendum submitted on January 6, 2023. WDNR concurred with the proposed site investigation activities on January 20, 2023.
Work Completed
Field investigation activities included collecting two surface water samples, observing stormwater and retention pond connections, installing three groundwater monitoring wells, well development, slug testing, and groundwater sampling. A SI Report is being prepared.
Work Planned
The SI Report will be submitted with a technical review fee.
Proposed Schedule
The SI Report will be submitted in the third quarter of 2023.
|