Reporting Period: | 7/1/2023 - 12/31/2023 |
BRRTS No: | 02-41-580746 |
Activity Name: | AHPRC |
Status: | Remediation |
Activity: | Sampling/Monitoring |
Comments: | Waste characterization sampling was completed in July 2023 to support the potential future expansion of the existing AHPRC building. The sampling results and proposed soil management approach were documented in a Status Update letter submitted to the WDNR on September 28, 2023. Groundwater samples were collected from the existing site monitoring wells on October 19, 2023, with the results being provided to the WDNR in a data transmittal letter dated November 16, 2023. |
Submitted by Susan Petrofske on 01/09/2024 |