Definitions : Consultant Activities, Activity Type and Analysis Types
Consultant Details – Activities
- Approval
- Organization is associated with the approval of one or more of the following dam-related items: Dam Plan Approval (for construction, repair or removal), EAP, Hazard Rating, IOM, Permit (dam removal, new dam, transfer), Stability Analysis, etc.
- Inspection
- Organization has conducted one or more dam inspections
- Analysis
- Organization has submitted one or more of the items described under Analysis Type
Activity Type
- Dam - Construction/Repair Plans
- Developing plans and specifications for construction, repair or removal of dams
- Dam Inspections
- Conducting dam safety inspections and submitting reports
- Floodplain - Analysis
- Developing floodplain model and report of selected analysis type
- Community - Management
- Assisting communities in development and administration of ordinance, grant writing and other tasks
Analysis Type
- Case By Case Analysis in Floodplain
- Estimate of the 100 year flood elevations at land divisions and proposed development, not exceeding 5 acres situated in FEMA unmapped or Zone A areas
- Dam Failure Analysis
- Comprehensive study of potential dam failure impacts
- Encroachment Analysis
-
Hydraulic analysis of impacts caused by proposed activities within established floodway areas
- Flood Insurance Study
-
Comprehensive study developed for the NFIP to calculate flows and regulatory flood elevations, and to delineate/re-delineate floodplain/floodway boundaries for specific watercourses, lakes, or coastal flood hazard areas
- Floodplain Study
-
An estimate of the 100 year flood elevations at land divisions and proposed development, exceeding 5 acres situated in FEMA unmapped or Zone A areas
- Hydrology/Hydraulics Developed at a Dam
-
Estimate of the regional flood at a dam and the dam hydraulic capacity
- Flood Storage Analysis
- Hydraulic calculations of established flood storage capacity