NESHONOC P & R DISTRICT: Lake Neshonoc Sediment Trap Evaluation Study
The consultant will evaluate two sediment trap locations. Preliminary designs for each trap, including size, depth, volume, and location of each trap, shall be provided on engineering drawings. The two sediment cores and four sediment analyses must betaken from the sediment trap location that will be constructed by the lake district. Sediment analyses parameters which have been provided to the consultant will be included in the analyses. Evaluate spoil areas for the dredged and excavated materials. Preliminary engineering designs shall be provided for the dredge spoil area. An interim report shall be provided to the lake district and DNR providing all information necessary for the lake district to evaluate which sediment trap alternative provides the most benefit. This report will be due 5/1/92. Estimate cost of constructing traps in two locations. Information will be disseminated to the public by public meetings, summary report mailings, and local newspaper articles.
Project Type
|
LAKE_GRANT
-
Large Scale Lake Planning
|
Project ID
|
LPL-121 (3009-02)
|
Year Started
|
1992
|
Status
|
COMPLETE
|
Activities
- Lakes Planning Grant
- Retention Basin - Create or Improve
- Project Deliverable
- Issue News/Media Release
- Informational Meetings
- Develop/Distribute Brochures/Literature
- Monitor Water Quality or Sediment
Final Report and Products
People/Organizations Involved
-
Lake Neshonoc P&R District