Lake Name:


Find
a lake.


Contact information
For information on Lakes in Wisconsin, contact:
DNR Lake
Division of Water
Bureau of Water Quality
Grants Contacts

MIRROR LAKE MANAGEMENT DISTRICT: RES - Mirror Lake - Erosion Mitigation

The Mirror Lake Management District is sponsoring an erosion mitigation project on two gullies of Mirror Lake.

Project final deliverables include:

A written report of documenting the project activities with before and after installment pictures of the stone gabion baskets and down-gradient stabilization projects. The written report will outline the operation and maintenance schedule for the gabion baskets.

Specific project activities include:

The project will result in two stone gabion structures being installed to stabilize two gullies causing significant erosion into Mirror Lake. The area down-gradient of the gabion structures will be stabilized using NRCS standards. An operation and maintenance plan will be created for the project.

Special Conditions:

All permits must be issued before construction, and all regulatory requirements apply. The project will require a standard Operation and Maintenance agreement of 20 years.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

Project Type LAKE_GRANT - Lake Protection Grant
Project ID LPT79723
Year Started 2023
Status ACTIVE