PLEASANT LAKE PROTECTION & REHABILITATION DI: APM Plan Update, Two Gauges, Redesign of Outlet Pipe System
The Pleasant Lake Protection and Rehabilitation District will hire a contractor to install two lake level gauges and study alternatives for replacing the outlet pipe. The final report will contain the following elements: 1) results of a topographic survey for a parcel of land located due east of the Pleasant Lake outlet; 2) results of a wetland delineation if needed for a permit application; 3) a list of alternatives for replacement of the outlet pipe; 4) engineering calculations to size the outlet structure and pipe; 5) bid ready construction plans; 6) Federal, state and county permit applications and 7) map showing the locations of the lake level gauges and surveyed elevations.
Project Type
|
LAKE_GRANT
-
Large Scale Lake Planning
|
Project ID
|
LPL-1496-13
|
Year Started
|
2012
|
Status
|
COMPLETE
|
Activities
- Monitor Water Level
- Project Deliverable
- Lakes Planning Grant
Final Report and Products
People/Organizations Involved
-
Pleasant Lake P & R District