Wisconsin Department of Natural Resources

DOUGLAS COUNTY: Brule River Yellow Flag Iris EDRR Project


To Excel
IDInspector Name(s)Start DateEnd DatePaid HoursVolunteer HoursHours SpentLandingStation IDCountyEnteringLeavingContacted YesContacted NoWilling YesWilling NoUsed Past 5 Days - YesUsed Past 5 Days - NoPeople ContactedConfident Strongly AgreeConfident AgreeConfident DisagreeConfident Strongly DisagreeData EnteredComments2012-2013: Contacted 0 Times2012-2013: Contacted 1-2 Times2012-2013: Contacted 3-4 Times2012-2013: Contacted 5 Times2012-2013: Waterbodies 1-22012-2013: Waterbodies 3-42012-2013: Waterbodies 52010-2013: Inspect and Remove Plants - Yes2012-2013: Remove Plants Animals - Yes2012-2013: Remove Plants Animals - N/A2012-2013: Drain Water from Boat - Yes2012-2013: Drain Water from Livewell - Yes2012-2013: Drain Water from Livewell - N/A2012-2013: Dispose of Bait - Yes2012-2013: Dispose of Bait - N/A2012-2013: Took no steps2012-2013: Didn't Ask About Prevention Steps2012-2013: Aware of Laws - Yes2012-2013: Aware of Laws - No2012-2013: Aware of Laws - Unsure
354266415Zach Stewart8/10/2023 12:00 AM8/10/2023 11:59 PM000Bois Brule Winneboujou Club Bridge to Cutler Creek mouth10031262Douglas000000000000011/28/2023Conducted manual control of Yellow Flag Iris via hike in access at Rocky Run off County hwy H. Manually dug and in-situ dessicated ~12 colonies approx. 600 lbs.00000000000000000000
354266411Zach Stewart7/31/2023 12:00 AM7/31/2023 11:59 PM000Bois Brule Winneboujou Club Bridge to Cutler Creek mouth10031262Douglas000000000000011/28/2023Conducted manual control of Yellow Flag Iris between Winneboujou and Blacks Landing. Manually dug out plant material and rhizomes ~750 lbs, 15 colonies.00000000000000000000
350986352Zach Stewart7/31/2023 12:00 AM7/31/2023 11:59 PM000Bois Brule River - Black Landing10047935Douglas000000000000008/01/2023Used manual digging to remove Yellow Flag Iris immediately downstream of river access from Blacks Landing.00000000000000000000
350986346Zach Stewart7/17/2023 12:00 AM7/17/2023 11:59 PM000Bois Brule River- Upstream At Pine Tree Canoe Landing- Station #110013273Douglas000000000000008/01/2023Conducted manual control in and around Copper Range Campground00000000000000000000
350803523Zach Stewart6/29/2023 12:00 AM6/29/2023 11:59 PM000Bois Brule Winneboujou Club Bridge to Cutler Creek mouth10031262Douglas000000000000007/13/2023Lead field crew to conduct manual digging of Yellow Flag Iris for Brule River YFI EDRR Project. Led NCWMA, FWS, and public volunteer to remove approx. 1500 lbs between Winneboujou canoe landing and HWY 2 canoe landing. Observed successful in-situ desiccation from 2022 fieldwork, as well as large mature YFI individuals that were severely damaged by partial digging in 2022. Damage from 2022 appears to have killed 50-75% of rhizome mass, rendering subsequent control of remaining plant highly efficient as rhizomes can be more easily removed by hand.00000000000000000000
350803499Zach Stewart6/28/2023 12:00 AM6/28/2023 11:59 PM000Bois Brule River at Ranger Station10042846Douglas000000000000007/13/2023Lead field crew to conduct manual digging of Yellow Flag Iris for Brule River YFI EDRR Project. FWS and NCWMA crew helped to remove approx. 2250 lbs in Ranger Station and Little Joe Rapids area.00000000000000000000
350803496Zach Stewart6/27/2023 12:00 AM6/27/2023 11:59 PM000Bois Brule River - Stones Bridge163222Douglas000000000000007/13/2023Lead field crew to conduct manual digging of Yellow Flag Iris for Brule River YFI EDRR Project. Worked with FWS volunteers to remove approx. 1500 lbs in HWY 2 landing area.00000000000000000000
350803424Zach Stewart6/13/2023 12:00 AM6/13/2023 11:59 PM000Bois Brule River- Upstream At Pine Tree Canoe Landing- Station #110013273Douglas000000000000007/13/2023Manual control of Yellow Flag Iris for the Brule River YFI EDRR Project at Pine Tree Landing. In-situ desiccation piles from 2022 fieldwork are looking good! Rhizomes and plant material are very dry and dead. Removed approx 700 lbs of rootmass today.00000000000000000000
350803019Zach Stewart5/30/2023 12:00 AM5/30/2023 11:59 PM000Bois Brule River at Ranger Station10042846Douglas000000000000007/13/2023Conducted manual control of Yellow Flag Iris (Brule River YFI EDRR Project). Approximately 1000 lbs of Yellow Iris removed.00000000000000000000
350802958Zach Stewart5/29/2023 12:00 AM5/29/2023 11:59 PM000Bois Brule Winneboujou Club Bridge to Cutler Creek mouth10031262Douglas000000000000007/13/2023Conducted manual control of Yellow Flag Iris (Brule River YFI EDRR Project). Approximately 200 lbs of Yellow Iris removed.00000000000000000000
350803027Zach Stewart5/24/2023 12:00 AM5/24/2023 11:59 PM000Boise Brule River -- Highway 2 Canoe Landing10019061Douglas000000000000007/13/2023Conducted manual control of Yellow Flag Iris (Brule River YFI EDRR Project). Approximately 900 lbs of Yellow Iris removed.00000000000000000000
327411533Zach Stewart11/8/2022 12:00 AM1/1/0001 12:00 AM000Bois Brule River - Black Landing10047935Douglas000000000000011/09/2022Conducted manual control of Yellow Flag Iris, covering approx 2.3km of river bank (both sides) and removing an estimated 2500 lbs of plant material. 00000000000000000000
325798418Zach Stewart10/25/2022 12:00 AM1/1/0001 12:00 AM000Bois Brule River at Ranger Station10042846Douglas000000000000010/26/2022Conducted manual control (digging) of dense YFI infestation on ~ 0.5 kms of shoreline immediately upstream from the DNR headquarters building on Ranger Road. Worked upstream to connect with the downstream edge of area controlled during the 7/8/22 volunteer YFI control event, and observed evidence of successfully desiccated plant material from that event.00000000000000000000
325182574Zach Stewart10/13/2022 12:00 AM1/1/0001 12:00 AM000Brule River Range Rd to Nebagamon Cr10050690Douglas000000000000010/17/2022Conducted manual control of Yellow Flag Iris at Bois Brule Campground with assistance from one volunteer for part of the day. Removed approximately 30 large Yellow Flag Iris colonies from a densely infested section of river at Brule Campground over ~0.25km of stream bank (both sides).00000000000000000000
325182514Zach Stewart10/12/2022 12:00 AM1/1/0001 12:00 AM000Brule River Range Rd to Nebagamon Cr10050690Douglas000000000000010/17/2022Conducted manual control of Yellow Flag Iris near Ranger Road with assistance from one volunteer. Removed approximately 40 large Yellow Flag Iris colonies over ~1km of stream bank (both sides).00000000000000000000
323363720Zach Stewart9/22/2022 12:00 AM1/1/0001 12:00 AM000Brule River Range Rd to Nebagamon Cr10050690Douglas000000000000009/26/2022Conducted manual control of Yellow Flag Iris under Douglas County Brule River Yellow Flag Iris EDRR Project. Hiked in to station from Ranger Road and controlled all YFI along ~0.75km of river, removing ~1000 lbs of invasive plant material. 00000000000000000000
323363723Zach Stewart9/21/2022 12:00 AM1/1/0001 12:00 AM000Boise Brule River -- Highway 2 Canoe Landing10019061Douglas000000000000009/26/2022Conducted mapping and control of Yellow Flag Iris along 0.5 km of river near HWY 2 Canoe Landing as part of the Douglas County Brule River Yellow Flag Iris EDRR Project. Removed approx. 400 lbs of invasive plant material.00000000000000000000
320365945Zach Stewart8/23/2022 12:00 AM1/1/0001 12:00 AM000Bois Brule River- Upstream At Pine Tree Canoe Landing- Station #110013273Douglas000000000000008/24/2022Worked with one student volunteer to remove an estimated 1050 pounds of Yellow Flag Iris plant material - began at Pine Tree Canoe Landing (downstream end of the Brule YFI EDRR Project area) and worked upstream about 1/2 km.00000000000000000000
320365869Zach Stewart8/23/2022 12:00 AM1/1/0001 12:00 AM000Bois Brule Winneboujou Club Bridge to Cutler Creek mouth10031262Douglas000000000000008/24/2022Organized volunteer event to control Yellow Flag Iris near Winneboujou - 5 volunteers contributed for ~3 hours, removing an estimated 950 pounds of plant material.00000000000000000000
316572787Zach Stewart7/8/2022 12:00 AM1/1/0001 12:00 AM000Bois Brule Winneboujou Club Bridge to Cutler Creek mouth10031262Douglas000000000000007/12/2022Sponsored volunteer event with 6 volunteers in attendance to manually control Yellow Flag Iris between Winneboujou Canoe Landing and Hwy 2 Canoe Landing.00000000000000000000
315374344Zach Stewart6/28/2022 12:00 AM1/1/0001 12:00 AM000Bois Brule River- Upstream At Pine Tree Canoe Landing- Station #110013273Douglas000000000000006/29/2022Manual control of Yellow Flag Iris starting at Pine Tree Canoe landing and working upstream. ~400 lbs of plant material removed. More to tackle upstream from work site.00000000000000000000
315309280Zach Stewart6/22/2022 12:00 AM1/1/0001 12:00 AM000Bois Brule River - Stones Bridge163222Douglas000000000000006/23/2022Manual control of Yellow Flag Iris between Stones Bridge and Winneboujou (~16km) Manual control of Yellow Flag Iris between Stone's Bridge Landing and Winneboujou Landing.00000000000000000000
314715536Zach Stewart6/15/2022 12:00 AM6/15/2022 11:59 PM000Bois Brule Winneboujou Club Bridge to Cutler Creek mouth10031262Douglas000000000000006/16/2022Carried out manual control of Yellow Flag Iris on stretch of river from Winneboujou Canoe Landing to Highway 2 Canoe Landing with group of 8 volunteers. Working under Brule River Yellow Flag Iris EDRR Project with associated APM for manual control of YFI.00000000000000000000
297541751Zach Stewart6/10/2021 12:00 AM1/1/0001 12:00 AM000Bois Brule Winneboujou Club Bridge to Cutler Creek mouth10031262Douglas000000000000012/17/2021Douglas County AIS Coordinator, Zach Stewart, conducted preliminary surveillance in the lower section of the 35km project area. Prelim mapping was conducted from Winneboujou Canoe Landing (E County Road B) to Pine Tree Canoe Landing (Dead End Road), with a focus on the target species Yellow Flag Iris. Numerous infestations of Yellow Flag Iris were discovered and marked in this stretch, which is consistent with anecdotal reports that the Yellow Flag Iris infestation on the Brule has been spreading in recent years. 00000000000000000000
297541741Zach Stewart5/29/2021 12:00 AM1/1/0001 12:00 AM000Bois Brule River - Stones Bridge163222Douglas000000000000012/17/2021Douglas County AIS Coordinator, Zach Stewart, conducted preliminary surveillance with project partner Steph Judge from The Nature Conservancy. Prelim mapping was conducted from Stone's Bridge Landing (County road S) to Winneboujou Canoe Landing (E County Road B), with a focus on the target species Yellow Flag Iris. Numerous infestations of Yellow Flag Iris were discovered and marked in this stretch, which is consistent with anecdotal reports that the Yellow Flag Iris infestation on the Brule has been spreading in recent years. 00000000000000000000