BIG MUSKEGO/BASS BAY P & R DISTRICT: Big Muskego Lake Drawdown Diagnostic Feasibility Study Repor

Purpose

The Big Muskego/Bass Bay Protection and Rehabilitation District proposes to produce a final technical report detailing the results of the Big Muskego Lake drawdown diagnostic Feasibility study. Project activities include producing an interim data summary report and a final technical report, and associated project coordination and administration activities. The Department of Natural Resources will be provided with a paper copy and an electronic copy of the final report. Information about the project results will be disseminated to the public by report mailing, public meeting, and newsletter mailing.

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Lakes Grant
Large Scale Lake Planning
LPL-435
1997
Complete
 
Reports and Documents
Lakes Planning Report. Interim Report 1: Predrawdown Results. Eau Galle Aquatic Laboratory; U.S. Army Engineers Waterways Experiment Station, Spring Valley, Wisconsin 54767
 
Activities & Recommendations
Grant Awarded
The Big Muskego/Bass Bay Protection and Rehabilitation District proposes to produce a final technical report detailing the results of the Big Muskego Lake drawdown diagnostic Feasibility study. Project activities include producing an interim data summary report and a final technical report, and associated project coordination and administration activities. The Department of Natural Resources will be provided with a paper copy and an electronic copy of the final report. Information about the project results will be disseminated to the public by report mailing, public meeting, and newsletter mailing.
Diagnostic/Feasibility Assessment