Lakes Grant
Large Scale Lake Planning
LPL-014 (2004-01)
1990
Complete
Grant Awarded
Water quality monitoring by the USGS for 1991 through 1993. Sampling parameters are as described in the application. Sampling will be conducted in 3 sites on the schedule at the depths described. An annual progress report is to be submitted after eachyear of monitoring. The project includes a formal presentation to the public and preparation of a final report in 1993. Dissemination of information to the public will be through newsletter and local newspaper articles. Project results will bereposited at the Village Hall, Hustisford.
Monitor Water Quality or Sediment
10099639