CITY OF FOND DU LAC: Lake Winnebago Stormwater Exfiltrat. Stdy/BP Monitoring

Purpose

The City of Fond Du Lac proposes to do a stormwater study and bypass monitoring on Lake Winnebago. This project will identify potential sources of stormwater exfiltration from storm sewers into sanitary sewers, evaluate alternatives and recommend ways to alleviate the problem. Some of the activities included in this grant will include: 1) review stormwater pumping station plans and storm sewer system plans, 2) field viewing and structural reviews of storm sewer systems, 3) analysis and monitoring of pump station and storm sewer system capacities and water quality monitoring during at least two bypass events, 4) evaluate and recommend alternative improvements. The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newspaper articles, an Engineering Feasibility Study Report mailings and public meeting(s).

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Lakes Grant
Large Scale Lake Planning
LPL-526
1997
Complete
 
Reports and Documents
Lakes Planning Report
 
Activities & Recommendations
Stormwater Planning, Implementation
Grant Awarded
The City of Fond Du Lac proposes to do a stormwater study and bypass monitoring on Lake Winnebago. This project will identify potential sources of stormwater exfiltration from storm sewers into sanitary sewers, evaluate alternatives and recommend ways to alleviate the problem. Some of the activities included in this grant will include: 1) review stormwater pumping station plans and storm sewer system plans, 2) field viewing and structural reviews of storm sewer systems, 3) analysis and monitoring of pump station and storm sewer system capacities and water quality monitoring during at least two bypass events, 4) evaluate and recommend alternative improvements. The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newspaper articles, an Engineering Feasibility Study Report mailings and public meeting(s).
 
Watershed
 
Waters