CITY OF STEVENS POINT: McDill Pond Lake Management Planning

Purpose

1) Compile existing land use information and make projections for future development. 2) Use eutrophication modeling technique to calculate nutrient and sediment loading for present and future land use.3) Conduct a lake user survey. 4) Conduct water quality sampling during 1992 per application specs. 5) Conduct erosion/sediment mapping of problem areas. Identify controllable nutrient sources.6) Determine target levels for lake water quality parameters. 7) Develop alternatives to achieve desired reductions in nutrient loading to lake.8) Disseminate information to the public by newsletter, local newspaper articles, fact sheet, public meetings, and the final report.

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Lakes Grant
Large Scale Lake Planning
LPL-126 (5019-01)
1992
Complete
 
Reports and Documents
Lakes Planning Report
 
Activities & Recommendations
Grant Awarded
1) Compile existing land use information and make projections for future development. 2) Use eutrophication modeling technique to calculate nutrient and sediment loading for present and future land use.3) Conduct a lake user survey. 4) Conduct water quality sampling during 1992 per application specs. 5) Conduct erosion/sediment mapping of problem areas. Identify controllable nutrient sources.6) Determine target levels for lake water quality parameters. 7) Develop alternatives to achieve desired reductions in nutrient loading to lake.8) Disseminate information to the public by newsletter, local newspaper articles, fact sheet, public meetings, and the final report.
Water Quality Modeling
10099775
Social Survey of Residents or Users
10099775
Develop/Distribute Brochures/Literature
Develop/Distribute Newsletter
Informational Meetings
 
Watershed