TOWN OF HUBBARD: Sinissippi Lake Lab Analysis

Purpose

The Town of Hubbard proposes to study and analyze water quality and sediment loads that are going into Lake Sinissippi. This is phase four of a four phase project. This final phase of the project will cover mainly the lab costs for the the other phases. Analylis of all the samples will provide information used in determining the impacts to Lake Sinissippi. All four parts of this project need to be complete to get full final results. The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by news letter(s), summary report, fact sheet and entire report mailings, public meetings(s) and local newspaper articles.

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Lakes Grant
Large Scale Lake Planning
LPL-505
1997
Complete
 
Activities & Recommendations
Grant Awarded
The Town of Hubbard proposes to study and analyze water quality and sediment loads that are going into Lake Sinissippi. This is phase four of a four phase project. This final phase of the project will cover mainly the lab costs for the the other phases. Analylis of all the samples will provide information used in determining the impacts to Lake Sinissippi. All four parts of this project need to be complete to get full final results. The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by news letter(s), summary report, fact sheet and entire report mailings, public meetings(s) and local newspaper articles.
 
Watershed
 
Waters