CITY OF MONDOVI: Mirror Lake Predredging Assessment

Purpose

City of Mondovi proposes to the following lake management activities on Mirror Lake:1) Prepare bathymetric map ofthe bottom of Mirror Lake. Prepare intial plan for dredge cut, present the plan to the City for review, revise plan based on City input, present revised plan to WI DNR to determine the number and locations of sediment samples to take and the number and type of analyses to run on the samples. 2) Based on the above information obtain a quote from a responsible testing firm and conduct the field work according to the agreed on methods and analyze the samples at a responsible liscensed testing lab. 3) Obtain estimates for the entire dredging project based on the plan and lab test results. 4) Prepare complete final report detailing finding and present it to the City and determine the course of action. The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the general public by public meeting and local newspaper articles. The final report will be also made available at City Hall.

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Lakes Grant
Large Scale Lake Planning
LPL-451
1997
Complete
 
Reports and Documents
Lakes Planning Report
 
Activities & Recommendations
Grant Awarded
City of Mondovi proposes to the following lake management activities on Mirror Lake:1) Prepare bathymetric map ofthe bottom of Mirror Lake. Prepare intial plan for dredge cut, present the plan to the City for review, revise plan based on City input, present revised plan to WI DNR to determine the number and locations of sediment samples to take and the number and type of analyses to run on the samples. 2) Based on the above information obtain a quote from a responsible testing firm and conduct the field work according to the agreed on methods and analyze the samples at a responsible liscensed testing lab. 3) Obtain estimates for the entire dredging project based on the plan and lab test results. 4) Prepare complete final report detailing finding and present it to the City and determine the course of action. The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the general public by public meeting and local newspaper articles. The final report will be also made available at City Hall.
Dredging
10099974
Map Depth of Lake (Bathymetry)
 
Watershed