Lakes Grant
Large Scale Lake Planning
LPL-660
1999
Complete
Lakes Planning Report
Grant Awarded
The Williams Lake Protection & Rehabilitation District proposes to conduct an Aquatic Plant Survey and using that data, develop an APM Plan. Project deliverables include modified lin-transect method of sampling, one sampling period in mid-summer, identification of plant problems, recommendations for plant control and equipment evaluation. A final report will be provided to the District for future educational purposes, and the DNR will be provided with both a paper copy and an electronic copy of the final report.
Lakes Planning Grant
Aquatic Plant Management Plan
The Williams Lake Protection & Rehabilitation District proposes to conduct an Aquatic Plant Survey and using that data, develop an APM Plan. Project deliverables include modified lin-transect method of sampling, one sampling period in mid-summer, identification of plant problems, recommendations for plant control and equipment evaluation.
Aquatic Plant Monitoring or Survey
Project Deliverable
Final Report