Lakes Grant
Large Scale Lake Planning
LPL-386
1996
Complete
Lakes Planning Report
Grant Awarded
The Post Lakes Protection and Rehabilitation District proposes to continue the inspection of septic systems around Upper Post Lake to determine compliance with code and report failures. j A minimum of 103 septic systems will be inspected and the results reported for follow-up compliance. A final report of the inspection results that indicates soil conditions, system elevation, visual observation descriptions, and opinion of code compliance status for each system inspected. A paper and an electronic copy of the final report will be provided to the Department of Natural Resources. Information on the project results will be disseminated to the public by newsletter, entire report mailing, public meeting, summary report mailing, and local newspaper article.
Lakes Planning Grant
Permit Compliance Inventory
Wastewater Monitoring or Management
septic system inspections
Project Deliverable
Final Report
Develop/Distribute Brochures/Literature
Develop/Distribute Newsletter
Informational Meetings
Issue News/Media Release