LAKE ALTOONA P & R DISTRICT: Lake Altoona Sedimentation Study - Dredge Spoil Site Study

Purpose

Conduct dredge spoil disposal site evaluations. Conduct a survey of the selected dredge spoil disposal site. Obtain soil borings of selected dredge spoil disposal site. Prepare a preliminary site design. Conduct a value engineering study. Prepare afinal design of boat channel/sediment trap. Information will be disseminated to the public by newsletter, local newspaper articles and public meetings. Project results will be reposited at Eau Claire Land Conservation Conservation Dept., 227 First St.,Altoona.

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Lakes Grant
Large Scale Lake Planning
LPL-195
1994
Complete
 
Activities & Recommendations
Grant Awarded
Conduct dredge spoil disposal site evaluations. Conduct a survey of the selected dredge spoil disposal site. Obtain soil borings of selected dredge spoil disposal site. Prepare a preliminary site design. Conduct a value engineering study. Prepare afinal design of boat channel/sediment trap. Information will be disseminated to the public by newsletter, local newspaper articles and public meetings.
Dredging
10100564
 
Watershed