Lakes Grant
Large Scale Lake Planning
LPL-195
1994
Complete
Grant Awarded
Conduct dredge spoil disposal site evaluations. Conduct a survey of the selected dredge spoil disposal site. Obtain soil borings of selected dredge spoil disposal site. Prepare a preliminary site design. Conduct a value engineering study. Prepare afinal design of boat channel/sediment trap. Information will be disseminated to the public by newsletter, local newspaper articles and public meetings.
Dredging
10100564