River Grant
River Planning Grant
RP-088-04
2003
Complete
Grant Awarded
The Friends of the Branch River proposes to develop a strategic plan for the Friends of the Branch River river enhancement project. The project will take place in two phases. This is phase 2 and will include conducting water quality monitoring during baseflow and event conditions, holding facilitated strategic planning workshops, training volunteer river monitors, analyzing monitoring results from both phases, and presenting the conclusions to the public through informational meetings and newspaper articles. The strategic plan and power point presentation will be submitted to the Department of Natural Resources after completion of phase 2 of the project. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Monitor Water Quality or Sediment
The Friends of the Branch River proposes to develop a strategic plan for the Friends of the Branch River river enhancement project. The project will take place in two phases. This is phase 2 and will include conducting water quality monitoring during baseflow and event conditions, holding facilitated strategic planning workshops, training volunteer river monitors, analyzing monitoring results from both phases, and presenting the conclusions to the public through informational meetings and newspaper articles. The strategic plan and power point presentation will be submitted to the Department of Natural Resources after completion of phase 2 of the project. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Hold Workshops
The Friends of the Branch River proposes to develop a strategic plan for the Friends of the Branch River river enhancement project. The project will take place in two phases. This is phase 2 and will include conducting water quality monitoring during baseflow and event conditions, holding facilitated strategic planning workshops, training volunteer river monitors, analyzing monitoring results from both phases, and presenting the conclusions to the public through informational meetings and newspaper articles. The strategic plan and power point presentation will be submitted to the Department of Natural Resources after completion of phase 2 of the project. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Train Volunteers
The Friends of the Branch River proposes to develop a strategic plan for the Friends of the Branch River river enhancement project. The project will take place in two phases. This is phase 2 and will include conducting water quality monitoring during baseflow and event conditions, holding facilitated strategic planning workshops, training volunteer river monitors, analyzing monitoring results from both phases, and presenting the conclusions to the public through informational meetings and newspaper articles. The strategic plan and power point presentation will be submitted to the Department of Natural Resources after completion of phase 2 of the project. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Information and Education
The Friends of the Branch River proposes to develop a strategic plan for the Friends of the Branch River river enhancement project. The project will take place in two phases. This is phase 2 and will include conducting water quality monitoring during baseflow and event conditions, holding facilitated strategic planning workshops, training volunteer river monitors, analyzing monitoring results from both phases, and presenting the conclusions to the public through informational meetings and newspaper articles. The strategic plan and power point presentation will be submitted to the Department of Natural Resources after completion of phase 2 of the project. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Informational Meetings
The Friends of the Branch River proposes to develop a strategic plan for the Friends of the Branch River river enhancement project. The project will take place in two phases. This is phase 2 and will include conducting water quality monitoring during baseflow and event conditions, holding facilitated strategic planning workshops, training volunteer river monitors, analyzing monitoring results from both phases, and presenting the conclusions to the public through informational meetings and newspaper articles. The strategic plan and power point presentation will be submitted to the Department of Natural Resources after completion of phase 2 of the project. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Issue News/Media Release
The Friends of the Branch River proposes to develop a strategic plan for the Friends of the Branch River river enhancement project. The project will take place in two phases. This is phase 2 and will include conducting water quality monitoring during baseflow and event conditions, holding facilitated strategic planning workshops, training volunteer river monitors, analyzing monitoring results from both phases, and presenting the conclusions to the public through informational meetings and newspaper articles. The strategic plan and power point presentation will be submitted to the Department of Natural Resources after completion of phase 2 of the project. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Project Deliverable
The Friends of the Branch River proposes to develop a strategic plan for the Friends of the Branch River river enhancement project. The project will take place in two phases. This is phase 2 and will include conducting water quality monitoring during baseflow and event conditions, holding facilitated strategic planning workshops, training volunteer river monitors, analyzing monitoring results from both phases, and presenting the conclusions to the public through informational meetings and newspaper articles. The strategic plan and power point presentation will be submitted to the Department of Natural Resources after completion of phase 2 of the project. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Rivers Planning Grant
The Friends of the Branch River proposes to develop a strategic plan for the Friends of the Branch River river enhancement project. The project will take place in two phases. This is phase 2 and will include conducting water quality monitoring during baseflow and event conditions, holding facilitated strategic planning workshops, training volunteer river monitors, analyzing monitoring results from both phases, and presenting the conclusions to the public through informational meetings and newspaper articles. The strategic plan and power point presentation will be submitted to the Department of Natural Resources after completion of phase 2 of the project. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.