TMDL/303d Projects
Monitor Listed Waters
Popple_Lake_303d
2006
Complete
POPPLE LAKE FY07 MONITORING PLAN
Data Documentation Popple Lake Impaired Waters listing Documentation, Chippewa County
TMDL Development
The goal of this project is to collect additional water chemistry on Popple Lake for the development of a TMDL. Sampling will consist of bi-weekly sampling from July through mid-September (5 sample events in total). Temperature, Dissolved Oxygen and Conductance profiles will be taken during each sampling event in addition to epilimnetic and hypolimnetic water chemistry samples. Epilimnetic samples will be collected as a 2 m integrated sample. The bi-weekly summer epilimnetic samples will be analyzed for total phosphorus and chlorophyll-a. The hypolimnetic samples will be analyzed total phosphorus. All sampling will take place during the calendar year 2006 field season.
Monitor or Propose 303(d) Listing
The goal of this project is to collect additional water chemistry on Popple Lake for the development of a TMDL