Lakes Grant
Large Scale Lake Planning
LPL-1140-07
2006
Complete
Grant Awarded
The Town of Eaton proposes to conduct a Lily Lake Watershed Land Use and Water Quality Study, as described in the planning grant application dated August 1, 2006 phase 1 of the proposal includes:
1) Determination and mapping of the watershed
2) Inventory of historic and current land uses in Lily lake watershed
3) Obtain secchi disc readings
4) Analysis of Local, County and State plans and ordinances effecting the Lilly Lake watershed
The results of the study will be submitted in a report to be presented to the Town of Eaton Planning Commission and Board for their consideration and implementation. A detailed delineation of the Lilly Lake watershed will be established through the use of Brown County\00BFs existing digital terrain model and geographic information system.
Comprehensive Planning Studies
11971674
Grant Awarded
The Town of Eaton proposes to conduct a Lily Lake Watershed Land Use and Water Quality Study, as described in the planning grant application dated August 1, 2006 phase 1 of the proposal includes:
1) Determination and mapping of the watershed
2) Inventory of historic and current land uses in Lily lake watershed
3) Obtain secchi disc readings
4) Analysis of Local, County and State plans and ordinances effecting the Lilly Lake watershed
The results of the study will be submitted in a report to be presented to the Town of Eaton Planning Commission and Board for their consideration and implementation. A detailed delineation of the Lilly Lake watershed will be established through the use of Brown County\00BFs existing digital terrain model and geographic information system.