Lakes Grant
Large Scale Lake Planning
LPL159916
2015
Complete
The City's goal for this project is to ftnd existing locations of PCB laden soils and to create a feasibility plan for dredging these soils from Winnequah Park Lagoon. The City hopes to prevent PCBs in the accumulated sediment and soils at the bottom of the lagoon from affecting water quality, animal habitat, and potentially human health. This project would be carried out in phases in an attempt to take a more comprehensive approach to reinvigorating the City's largest park and largest water habitat outside of Lake Monona and Yahara River. Monetary assistance was used along with City cost share to accomplish the objectives to acquire the information necessary to perform the task of safely dredging the lagoon of contaminated soil and accumulated sediment while also providing a framework for designing a stmmwater treatment project and shoreland restoration project.
The City's goal for this project is to ftnd existing locations of PCB laden soils and to create a feasibility plan for dredging these soils from Winnequah Park Lagoon. The City hopes to prevent PCBs in the accumulated sediment and soils at the bottom of the lagoon from affecting water quality, animal habitat, and potentially human health. This project would be carried out in phases in an attempt to take a more comprehensive approach to reinvigorating the City's largest park and largest water habitat outside of Lake Monona and Yahara River. Monetary assistance was used along with City cost share to accomplish the objectives to acquire the information necessary to perform the task of safely dredging the lagoon of contaminated soil and accumulated sediment while also providing a framework for designing a stmmwater treatment project and shoreland restoration project.
Grant Awarded
The City of Monona is sponsoring a project to assess the feasibility of dredging within the Winnequah Park Lagoon system, which drains into Lake Monona. Project final deliverables include: a technical memorandum documenting the plan efforts.
Specific project activities include: hosting public meetings, analyzing sediment samples for contaminants, and surveying topography in the area. This information will be incorporated into a conceptual plan and specifications for the dredging. They will also create a WinSLAMM model to quantify pollutant loads from subwatersheds at up to 10 outfalls to plan for future stormwater treatment devices that will protect a future dredging investment.