BEAVER DAM LAKE MANAGEMENT DISTRICT: Stormwater Improvements for 3rd Avenue & Jeffery Boulevard

Purpose

The Beaver Dam Lake Management District is sponsoring a project to design and install storm water improvement practices in the City of Cumberland along Beaver Dam Lake. Special conditions: Storm water improvement practices including manhole catch basins and sediment sumps shall be operated and maintained for a minimum of 25 years in accordance with the operation and maintenance plan, which must be approved by the Department. A contract will specify these approved plans and be filed with the Register of Deeds. The final deliverables include a summary report that includes final designs and modeling results; pre/post site photos; and copies of signed operation and maintenance plans and recorded contracts. This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. The grant sponsor shall submit all data, records, and reports, including GIS-based maps and digital images, to the Department in a format specified by the regional Lakes Biologist.

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Lakes Grant
Lake Protection Grant
LPT57718
2018
Complete
 
Reports and Documents
During and after construction photos.
Comparison of Pre‐ versus Post‐Construction Nutrient Loading for Phosphorus and TSS.
Summary of tasks associated with the construction of the three stormwater improvement projects at 3rd Avenue and Jeffery Boulevard in Cumberland per WI-DNR Lake Protection Grant LPT57718.
Image used for the 2020 Story Map. Project associated with image is Stormwater Improvements for 3rd Avenue & Jeffery Boulevard. The waterbody is Beaver Dam Lake.
Design plans for 3rd Ave and Jeffery Blvd Stormwater Improvements
 
Activities & Recommendations
Grant Awarded
The Beaver Dam Lake Management District is sponsoring a project to design and install storm water improvement practices in the City of Cumberland along Beaver Dam Lake. Special conditions: Storm water improvement practices including manhole catch basins and sediment sumps shall be operated and maintained for a minimum of 25 years in accordance with the operation and maintenance plan, which must be approved by the Department.
 
Watershed
 
Waters