Lower Turtle Lake 2018 - 19 CLP Planning Project - CBCW Monitoring

Purpose

This project will house all of the CBCW watercraft inspection data for surface water grant AEPP52718. The Lower Turtle Lake Management District is sponsoring a project to conduct aquatic plant monitoring and update the aquatic plant management plan. Project deliverables include GIS data & maps of areas monitored, aquatic plant survey results, AIS and water quality monitoring data in SWIMS, AIS monitoring reports, shoreline and woody habitat data and report, and an updated APM plan. Specific project activities include: 1) CBCW watercraft inspection; 2) Volunteer AIS monitoring; 3) Spring and summer whole lake point intercept aquatic plant surveys; 4) CLP bed mapping; 5) APM plan update; 6) Lake water quality monitoring; 7) Shoreline and woody habitat monitoring. Special Conditions: 1) Sponsor shall contact DNR immediately if a new AIS is found; 2) Personnel conducting CBCW, water quality monitoring, or AIS monitoring shall be trained and follow DNR approved protocols; 3) All monitoring and CBCW inspection data shall be entered into SWIMS; 4) WDNR\2019s Aquatic Plant Management in Wisconsin guidance shall be followed for point-intercept survey monitoring and aquatic plant management plan development. The NOR Native Plant Protection Strategy shall be integrated into the APM plan. This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, reports, and education materials, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional lake coordinator.

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Watercraft Inspections
AEPP52718-CBCW
2018
Active
 
Reports and Documents