BLACK OTTER LAKE P & R DISTRICT: Black Otter Lake Survey/Analysis/Drawdown Planning Project

Purpose

The Black Otter Lake District proposes to conduct a feasibility study and report for drawdown and update their existing management plan including the following: 1. Complete bathymetric map (requires compliance with State standards for mapping) 2. Complete qualitative analysis and depth profiles of lake sediments 3. Develop drawdown scenarios and plans 4. Complete updated management plan.

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Lakes Grant
Large Scale Lake Planning
LPL-1190-08
2007
Complete
 
Reports and Documents
Lake Management Plan for the Black Otter Lake District.
 
Activities & Recommendations
Diagnostic/Feasibility Assessment
19382258
Comprehensive Planning Studies
19382258
Lake Management Plan Development
19382258
Map Depth of Lake (Bathymetry)
Grant Awarded
The Black Otter Lake District proposes to conduct a feasibility study and report for drawdown and update their existing management plan including the following: 1. Complete bathymetric map (requires compliance with State standards for mapping) 2. Complete qualitative analysis and depth profiles of lake sediments 3. Develop drawdown scenarios and plans 4. Complete updated management plan.
Grant Awarded
The Black Otter Lake District proposes to conduct a feasibility study and report for drawdown and update their existing management plan including the following: 1. Complete bathymetric map (requires compliance with State standards for mapping) 2. Complete qualitative analysis and depth profiles of lake sediments 3. Develop drawdown scenarios and plans 4. Complete updated management plan.
 
Watershed
 
Waters