Purpose
The Townsend Flowage Protection District is sponsoring a project for EWM Treatment and Management on Townsend Flowage.
Project final deliverables include: all data collected, agendas and minutes for planning meetings, and a summary report that includes methodologies, and results from treatments.
Specific project activities include: 1) Aquatic plant monitoring; 2) Early season aquatic invasive species surveys; 3) Herbicide concentration monitoring;
Special Conditions: 1) All data will be entered into SWIMS Database; 2) All data collection will be done with Department approved protocols. 3) Aquatic plant pre and post treatment point intercept surveys shall be conducted on all treatment areas and according to WDNR\2019s \2018Recommended Baseline Monitoring of Aquatic Plants in WI\2019 Protocol PUB-SS-1068.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.Related Reports
Run Project Summary ReportView Umbrella-ProjectsView Related-ProjectsAquatic Invasives Grant
Aquatic Invasives Control
ACEI24721
2021
Active
Grant Awarded
Grant ACEI24721 awarded