BONE LAKE MANAGEMENT DISTRICT: Bone Lake Internal Loading Study

Purpose

The Bone Lake Management District will support a study to asses the release of phosphorous from Bone Lake sediment. This information will be used to supplement data from a 2008 study to estimate internal phosphorous loading. In addition, the project includes the purchase a dissolved oxygen meter for use in determining anoxic areas. Activities include: 1) Purchase Dissolved Oxygen Meter; 2) Conduct nutrient sampling during anoxic conditions; 3) Analyze results to determine internal phosphorous loading. Specific deliverables for this grant include: 1) Final Project Report (paper and electronic copies) including summary of accomplishments including description of the phosphorous profile study and phosphorous loading analysis. The report will also include a description of the D.O. meter and any accessories purchased; 2) Data from nutrient sampling will be entered into WILMS; 3) AIS related materials generated or paid for by this grant. Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation. This scope is intended to summarize the grant application scope and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Lakes Grant
Small Scale Lake Planning
SPL-202-09
2009
Complete
 
Reports and Documents
 
Activities & Recommendations
Purchase Dissolved Oxygen Meter
Grant Awarded
The Bone Lake Management District will support a study to asses the release of phosphorous from Bone Lake sediment. This information will be used to supplement data from a 2008 study to estimate internal phosphorous loading. In addition, the project includes the purchase a dissolved oxygen meter for use in determining anoxic areas. Activities include: 1) Purchase Dissolved Oxygen Meter; 2) Conduct nutrient sampling during anoxic conditions; 3) Analyze results to determine internal phosphorous loading.
 
Watershed
 
Waters