Purpose
Pipe and North Pipe Lakes Protection and Rehabilitation District is sponsoring a project to conduct monitoring surveys for aquatic plants and AIS in Pipe and North Pipe Lakes.
Project final deliverables include: 1) survey results and reports
Specific project activities include: 1) Early detection surveys; 2) Point Intercept survey
Special Conditions: 1) All monitoring completed with Department approved protocols; 2) Point Intercept surveys shall be conducted according to: Baseline Monitoring of Aquatic Plants in Wisconsin: Sampling Design, Field and Laboratory Procedures, Data Entry and Analysis Lakes, Publication number PUB-SS-1068 2010.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee\2019s final payment request.
Related Reports
Run Project Summary ReportView Umbrella-ProjectsView Related-ProjectsAquatic Invasives Grant
Aquatic Invasives Education
AEPP70523
2023
Active
Grant Awarded
Grant AEPP70523 awarded