ENGLISH LAKE MANAGEMENT DISTRICT: English Lake AIS Control Proj.

Purpose

English Lake P&R District proposes to manage invasive species on English Lake during the period of April 1, 2012- June 30, 2015. The project elements and deliverables are specified within their control grant application dated January 20, 2012. All project requirements are listed below. This project requires that the following actions be completed on an annual basis unless otherwise specified: -Clean Boats Clean Waters (CBCW)- a minimum of 50hrs.- all data to be entered into SWIMS no later than October 1 -Citizen Lake Monitoring Network (CLMN) Early Detection Monitoring for invasive species- all data to be entered into SWIMS no later than October 1 -Host/attend one CBCW and CLMN training within the grant cycle -Handpulling of invasive species- all hours to be recorded on volunteer log worksheet -Conduct pre-/post- treatment monitoring surveys -Construct a boat cleaning station within the first year of the grant Annual progress reports and a final report summarizing this project is requirement and will be provided to the DNR. Please provide both paper and electronic .pdf copies of the final report along with, or prior to, submission of the grantee\2019s final payment request. If a consultant is to provide the final report, it is recommended that the Grantee provide the DNR AIS Coordinator with a draft for comment on report adequacy prior to making the final payment to the consultant. Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand ( partnership details can be found at: http://www.protectyourwaters.org).

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Aquatic Invasives Grant
Aquatic Invasives Control
ACEI-117-12
2012
Complete
 
Reports and Documents
A report summarizing the efforts to control invasive milfoil in English Lake between 2009 and 2015. The report contains detailed documentation of the efforts to control invasive milfoil in English Lake during 2015 and suggestions for milfoil control efforts in the future. End of report is the final report for the entire grant period.
 
Activities & Recommendations
Grant Awarded
Watercraft Inspections Clean Boats, Clean Waters
Monitor Invasive Species
Train Volunteers
CBCW Training
Monitor Pre and Post Treatment
Install Kiosk or Sign
Construct a boat cleaning station
Project Deliverable
Annual summary reports and final report
 
Watershed
 
Waters